
As-Built Services
At Archi Partners Design, we offer comprehensive as-built services to document your existing property with precision. Our team meticulously captures the current conditions of your space, providing a detailed foundation for any renovation, remodel, or new design project.

What Are As-Built Plans?
As-built plans are accurate representations of the current state of your property, including dimensions, layout, and structure. They are essential for ensuring that any future design or construction work is based on the real conditions of the building.
Our As-Built Process
On-Site Property Assessment
We begin by conducting a thorough on-site inspection, measuring and documenting every aspect of the building.
Digital Documentation
We deliver the as-built plans in digital formats, making it easy to share and integrate with future design plans.
Detailed As-Built Drawings
Our team creates precise as-built drawings, which include floor plans, elevations, and any structural details that are critical to the project.
Foundation for Future Design
Once the as-built plans are ready, they serve as the basis for your project’s design phase, ensuring accuracy and preventing costly errors during construction.

Why Choose Us for As-Built Services?
Accuracy & Precision
Our experienced team uses advanced tools and techniques to capture every detail, ensuring your as-built plans are a true reflection of the existing space.
Seamless Design Integration
These plans provide a smooth transition into the design phase, allowing for efficient project planning.
Save Time & Money
Accurate as-built plans minimize the risk of errors and ensure that your project moves forward without costly surprises.