The vocabulary of restaurant conversion.

The technical language of a restaurant permit set — BTU, MUA, NFPA 96, Type I hood, AHJ, IECC, plan check — in plain English. Bookmark this page; every guide and blog post on this site deep-links here so a defined term is always one click away.

Mechanical

Mechanical terms

BTU (British Thermal Unit)· BTU
The unit of energy a gas-fired cooking appliance consumes per hour. A standard residential burner is ~12,000 BTU; a commercial wok burner is 100,000–150,000 BTU per ring.

Why it matters: Hood, MUA, gas-line, and meter sizing all flow from total BTU load. Under-sizing here is the single most expensive correction in a restaurant conversion.

Link →
CFM (Cubic Feet per Minute)· CFM
The volumetric flow rate of an exhaust hood or make-up air unit. A typical commercial pizza hood pulls 1,500–2,500 CFM; a high-BTU wok hood can pull 4,000+ CFM.

Why it matters: NFPA 96 sets capture-velocity minimums in CFM per linear foot of hood. Inherited hoods sized for a sandwich line cannot satisfy a wok line.

Link →
Make-Up Air· MUA
Conditioned outside air drawn into the kitchen to replace what the hood exhausts. Sized at 80–85% of exhaust CFM as a tempered, dedicated unit.

Why it matters: Without MUA, the hood pulls negative pressure through the front door — slamming it, chasing customers out, and starving combustion appliances of oxygen.

Link →
Type I Hood
A grease-rated commercial exhaust hood with stainless construction, filter banks, and fire-suppression integration. Required over all grease-producing appliances per NFPA 96.

Why it matters: Almost every restaurant conversion needs at least one Type I hood; some need two (gas-line + solid-fuel) because they cannot share ductwork.

Link →
Type II Hood
A low-velocity hood rated for steam, heat, and odor — but NOT grease. Used over dishwashers, steam tables, ovens that vent steam only.

Why it matters: Spec-ing Type II over a flour-dusting bakery station or espresso bar keeps the cleaner work zone code-compliant without the cost of a Type I.

Link →
Capture Velocity
The face-velocity at the hood opening required to actually capture rising cooking effluent. NFPA 96 specifies 150 FPM minimum for most Type I applications.

Why it matters: A hood at the right CFM can still fail plan-check if the face-velocity geometry is wrong. Houston enforces this aggressively.

Link →
Ember Collector
A baffle / pan assembly inside a Type I hood that catches embers and sparks rising from solid-fuel appliances (wood ovens, charcoal smokers, charcoal grills).

Why it matters: NFPA 96 requires this on every solid-fuel hood. A gas-line hood without it cannot legally serve a wood-fired pizza oven.

Link →
Spark Arrestor
A wire-mesh device at the rooftop termination of a solid-fuel exhaust duct that prevents burning embers from escaping into the atmosphere.

Why it matters: Code-required for every solid-fuel duct. Missing spark-arrestors are a top-three cause of restaurant rooftop fires.

Link →
Climate Zone
The ASHRAE / IECC classification of a project's climate (1A – 8) used to set envelope, HVAC, and energy compliance paths. Phoenix is 2B (hot-dry); Houston is 2A (hot-humid).

Why it matters: Same hood schedule needs different MUA tempering depending on climate. A Phoenix design dropped into Houston without re-engineering will create humidity problems.

Link →

Plumbing

Plumbing terms

Grease Interceptor
An in-ground or in-line tank that separates fats, oils, and grease (FOG) from kitchen wastewater before it enters the sewer. Sized per IPC §1003 fixture-unit math.

Why it matters: Under-sized interceptors back up monthly and fail health inspection. Re-sizing after slab pour can be a six-figure rework.

Link →
Fats, Oils, and Grease· FOG
The grease load a kitchen sends to its interceptor. Wok cooking generates 2–3× the FOG of a sauté line; fried-chicken 4-vat lines generate more again.

Why it matters: Local FOG rules vary materially. Phoenix and Houston enforce strict sizing; some smaller jurisdictions are looser but local pump-out frequency is higher.

Link →
Floor Drain
A floor-level drain typically required under hood, sink, and ice-machine areas. Min 2" pipe diameter for most commercial uses; 3" for high-volume.

Why it matters: If the existing slab does not have drains in the right spots, saw-cutting concrete to add them is $3K–$8K per drain plus permit time.

Link →
Indirect Waste
A drain that discharges to a floor sink with an air gap (not a direct connection to the sewer). Required for ice machines, food-prep sinks, and most refrigeration condensate lines.

Why it matters: Inherited spaces often have direct-waste connections that need to be re-plumbed before health-department sign-off.

Link →

Electrical

Electrical terms

Three-Phase Power· 3-phase
A 208V or 480V power service that delivers three alternating-current phases — required for most large commercial equipment (mixers, batch freezers, induction tables, large dish machines).

Why it matters: Most retail shells were single-phase 120/240V. Upgrading to 3-phase is a $5K–$25K transformer + service rework depending on utility coordination.

Link →
Amperage
The current draw of a circuit, measured in amperes (A). A 3-group espresso machine pulls 30–40A at 208V; a pressure fryer pulls 30–50A.

Why it matters: Inherited 20A receptacles cannot serve most commercial cook-line equipment. New dedicated circuits and panel capacity are mandatory line items.

Link →
Sub-Panel
A secondary electrical panel fed from the main service, used to localize circuits in a specific zone (kitchen, basement, rooftop).

Why it matters: High-amperage kitchens often need a dedicated sub-panel; expect $4K–$9K including conduit, wire, and labor.

Link →

Code

Code terms

Authority Having Jurisdiction· AHJ
The local government body that issues building permits and enforces code in a specific jurisdiction — typically the city building department.

Why it matters: Two restaurants 8 miles apart can have wildly different plan-check rhythms and code interpretations because they sit under different AHJs.

Link →
International Building Code· IBC
The model commercial building code published by the International Code Council and adopted (with state amendments) by most U.S. jurisdictions. Current edition: IBC 2024.

Why it matters: Restaurant TI plan-check is anchored in IBC + the local amendment overlay. Knowing both is the difference between one and three correction cycles.

Link →
International Residential Code· IRC
The model residential code (1- and 2-family dwellings). Applies to custom homes and most ADUs; not to commercial restaurant TI.

Why it matters: Live/work or attached-restaurant projects sometimes straddle IBC + IRC; pulling the right code path early avoids late-stage re-engineering.

Link →
International Energy Conservation Code· IECC
The model energy code governing building envelope, HVAC efficiency, lighting power density, and commissioning. Current edition: IECC 2024.

Why it matters: Restaurants are energy-intensive; IECC compliance on hood schedules, MUA, and lighting routinely surprises operators coming from older shells.

Link →
NFPA 96
The National Fire Protection Association standard for the ventilation control and fire protection of commercial cooking operations. The default rulebook for hoods, ducts, and suppression.

Why it matters: Every restaurant conversion is graded against NFPA 96. Hood gaps, duct clearances, and access-panel rules originate here.

Link →
International Plumbing Code· IPC
The model plumbing code. Section 1003 sets grease-interceptor sizing; Section 802 covers indirect waste; numerous others govern fixture-unit math and drain venting.

Why it matters: IPC §1003 is the single most-cited interceptor sizing reference in restaurant plan review — know it before you bid the lease.

Link →
Americans with Disabilities Act· ADA
Federal civil-rights law requiring accessible design in public-accommodation spaces. Implemented through the 2010 ADA Standards (federal) and Chapter 11 of the IBC (state-adopted).

Why it matters: California enforces ADA aggressively (CBC §11B); LA + Bay AHJs correct nearly every first review. 5% of seating min 1 must be accessible.

Link →
Occupancy Classification
The IBC category that controls a building's required egress, sprinkler load, fire separation, and bathroom count. Restaurants are typically A-2 (Assembly, dining) or B (Business, ≤50 occupants).

Why it matters: Crossing the 50-occupant threshold flips a small café from B to A-2 — different exit count, different bathroom math. The threshold is binary.

Link →
Occupant Load
The IBC-prescribed maximum number of people permitted in a space. Calculated by dividing net floor area by an occupancy-specific factor (15 sq ft / person for dining; 7 for standing assembly).

Why it matters: Occupant load drives bathroom count, exit-door width, and emergency-lighting math. A 2,000 SF bar = 133 occupants = full A-2 bathroom rules.

Link →

Process

Process terms

Plan Check
The AHJ's formal review of a submitted permit set against code. Reviewers issue corrections; the design team responds; the cycle repeats until the set clears.

Why it matters: Anticipating plan-check pre-submission is what separates a 2-cycle permit from a 5-cycle one. Phoenix DSD averages 4–6 business days first review.

Link →
Permit-Ready Set
A complete architectural drawing set sufficient for plan-check submission — code analysis, site, floor plan, RCP, elevations, schedules, MEP coordination notes.

Why it matters: Not the same as a construction set. Permit-ready clears AHJ review; CD-level adds the granular detail GCs need to build from. APD's default deliverable is permit-ready.

Link →
Code Memo
A pre-drafting deliverable identifying applicable codes, occupant load, IBC section analysis, and flagged compliance risks BEFORE any sheets are drawn.

Why it matters: A 72-hour code memo at kickoff catches deal-breaker issues (occupancy crossover, hood clearance) while there's still time to renegotiate the lease.

Link →
Request for Information· RFI
A formal question from the contractor or AHJ during construction asking the designer to clarify intent, dimension, or specification of the drawings.

Why it matters: Tracked, dated, and resolved cleanly, an RFI log keeps a project moving. Sloppy logs are how 2-week delays become 2-month delays.

Link →
Certificate of Occupancy· CO
The final AHJ document permitting the building to be occupied — issued after final inspection passes building, electrical, plumbing, mechanical, and fire-marshal sign-offs.

Why it matters: No CO = no opening day. The full sign-off chain (building + fire + health) is the last 2-4 weeks of every restaurant project.

Link →

Walking a space and tripping on a term that's not on this page yet? Send it over — we'll add it.

Ask a question →