Skip to main content

Service · PMT.02

Permit expediting

IBC/IRC/IECC code review, plan-check responses, AHJ liaison.

HOW WE WORK

  • Fixed fee

    Quoted before we draw

  • Code sheet

    Opens every set

  • Fixed free

    Errors in our drawings

  • 50 states

    Projects we take

  • EN · ES · 中

    Languages

What we do

You have a set. You have a corrections list. You don’t have time. We pick it up, write the response narrative the plan reviewer is asking for, redline the sheets the way they want them, and walk the resubmittal through. AZ + Phoenix overlay specialty.

  • Plan-check corrections response, written and drawn
  • AHJ liaison — we know the reviewers
  • Phoenix overlay + local-amendment specialty
  • Resubmittal walk-through, included

What you get

  • Written response narrative, item-by-item
  • Redlined sheets matching reviewer comments
  • Code references with section numbers cited
  • Resubmittal package, ready to file
  • Walk-through to the right reviewer queue
  • Closeout report when the permit issues

Phoenix specifics

We prepare sets for the Phoenix Planning & Development, Maricopa County, Mesa, Tempe, Scottsdale, Chandler, Glendale, Gilbert, and Surprise queues, and we keep a checklist for each city, built from the correction comments reviewers have actually sent us.

Pricing

A fixed fee, priced once we have read the corrections letter.

FAQ

Frequently asked questions

  • Which building departments do you prepare sets for?

    Any U.S. building department — we take projects in all 50 states. Our home base is Phoenix, and for each city we keep a checklist built from the correction comments its reviewers have actually sent us. A job outside the Phoenix metro adds $550 to the quote, and with a building department new to us we check its submittal portal and correction format first rather than guess.

  • How fast is "permit expediting"?

    We can't make the AHJ review faster — what we do is keep the package clean enough to avoid corrections, and answer them item by item when they come. We track the AHJ's queue and follow up on day 1 of every published turnaround.

  • What happens if my permit gets rejected on first review?

    On a standard quote, our answers to the city’s comments on items in our scope are included, and if the city flags an error in our drawings, we fix it free. The only extras are if the AHJ asks for substantive new scope (e.g., adds a structural review requirement that wasn't in the original) — those are quoted separately, transparently.

  • Do you stamp drawings?

    No — we are a drafting studio, not a registered architecture or engineering firm, and we never apply a seal. Where a project needs an engineer’s seal, an independent engineer registered in your state is responsible for that part of the work: they prepare it, or directly supervise its preparation, and seal it. Engineering and seals, where your city requires them, are separate lines on your quote, so there are no surprises. If a project needs a registered architect, we refer you to one instead of taking it.

  • Do you submit permits on my behalf?

    Yes — for an itemized fee, we file the permit package directly with the AHJ, handle correction cycles, and shepherd the set through to issuance. Or you can take the finished set and submit it yourself. Your call; either way, the drawing scope is the same.

  • What is your revision policy?

    Every fixed-fee quote includes two rounds of revisions before construction documents are finalized. On a standard quote, our answers to the city’s comments on items in our scope are included, and if the city flags an error in our drawings, we fix it free. Substantive scope changes after CD freeze are quoted separately, as a fixed price, before the work starts.

  • Can you work with my existing GC, engineer, or interior designer?

    Yes. We routinely coordinate with general contractors, structural / MEP engineers, kitchen designers, and interior designers your team has already retained. We work in their CAD format, attend their coordination meetings, and produce drawings that bid cleanly against their scope.

  • How fast can you turn around a set?

    A Permit-Ready set typically takes 4–6 weeks from a complete brief. Your delivery date is in writing on the quote.

  • What languages do you work in?

    This website is in English, Spanish, and Chinese, and your proposal, agreement, estimates, and invoices can also be shown in Chinese (the English version governs). We can issue drawing sets bilingually if your trade contractors prefer Spanish — useful in Phoenix, Las Vegas, and Texas markets.

  • What insurance do you carry, and who is responsible if a drawing error causes a problem during construction?

    We carry general liability insurance, and we re-cut any drawing issue we caused at no charge. Because we are a drafting studio, any sheet that needs an engineer’s seal is prepared or directly supervised, and sealed, by an independent registered engineer who carries their own professional (errors-and-omissions) liability for that work. Ask us for our certificate of insurance before you sign.

  • Do I own the drawings, and can I get the editable CAD files?

    You receive the permit-ready set you paid for, and your contract spells out your rights to the files. If you need the native, editable CAD (DWG) — to hand to a builder, a sub, or another firm — tell us during intake so we confirm the deliverable format up front rather than at handoff.

  • What do you need from me to get started, and how much is the deposit?

    To quote, we need your project basics: the location or parcel, your scope, and any survey, existing plans, or even a rough sketch. Engagements start with a deposit at contract signing — paid by card, ACH, or check through the client portal — with the balance tied to project milestones. You do not need an architect's drawings to begin; we work from a napkin sketch or pick up an architect's earlier design.

  • Can you tell me what my project will cost to build, not just to draw?

    We don't quote construction costs — that's your general contractor's bid, and it depends on finishes, site conditions, and the current local labor and material market. We design to a clear, complete scope so your GC can price it tightly with fewer surprises, and we can connect you with GC partners for a build estimate.

PERMIT EXPEDITING

Stuck in plan check? We get you out.

We reply within one business day · fixed-fee quote

Contact

Begin a project.

Studio

Phoenix4435 E Chandler Blvd · Suite 200

Servicios disponibles en español · 中文版本 (602) 628-1231

Permit expediting — Phoenix drafting & permit plans · Archipartners Design