Service · MEP.06
MEP coordination
We coordinate MEP with the engineers who design and seal it. Scope writing, conflict detection.
HOW WE WORK
Fixed fee
Quoted before we draw
Code sheet
Opens every set
Fixed free
Errors in our drawings
50 states
Projects we take
EN · ES · 中
Languages
What we do
MEP is the most common drafting failure point. Where the city requires an MEP engineer, the engineer designs and seals the systems; we draw the layouts, write the scope for the engineer, run conflict detection between architectural and MEP backgrounds, and hand the GC a set that actually builds.
- Manual J/D/S load sizing and HVAC narrative
- Scope writing for the MEP engineers
- Conflict detection on architectural backgrounds
- IECC 2024 climate zone 2 compliance pathway
What you get
- Architectural background ready for MEP drafting
- Load sizing summary and HVAC narrative
- IECC compliance worksheet
- Plumbing fixture-unit count and gas demand
- Electrical service-size calc and panel schedule scope
- Conflict-detection report on the merged set
Phoenix specifics
Climate zone 2B (the Phoenix and Tucson areas) means cooling-dominated load profiles and tight envelope thresholds under the IECC. We pick the prescriptive vs. performance path that minimises corrections.
Pricing
Included in our tenant-improvement and multifamily sets. On its own, a fixed fee priced per project. The MEP engineers’ fees are separate lines on your quote.
FAQ
Frequently asked questions
What does "MEP coordination" include exactly?
Coordinating mechanical (HVAC), electrical, and plumbing layouts between the trade engineers and the architectural set so nothing collides on site. We mark conflicts (a duct routed through a beam, a plumbing chase too small for the riser, a panel feeder that needs a new circuit), issue RFIs to the relevant trade, and incorporate resolved decisions into the architectural drawings.
Do you do MEP design from scratch, or only coordinate?
Both, depending on the project. Small commercial TI: where no MEP engineer's seal is required, we produce the permit-set MEP layouts; where one is, an independent registered MEP engineer prepares or directly supervises those sheets and seals them.
Can you join my project's coordination meetings?
Yes — typically a weekly 30-minute call during the active coordination phase. Included in the fee for projects we're producing the architectural set on; itemized on the quote for coordination-only engagements.
Do you stamp drawings?
No — we are a drafting studio, not a registered architecture or engineering firm, and we never apply a seal. Where a project needs an engineer’s seal, an independent engineer registered in your state is responsible for that part of the work: they prepare it, or directly supervise its preparation, and seal it. Engineering and seals, where your city requires them, are separate lines on your quote, so there are no surprises. If a project needs a registered architect, we refer you to one instead of taking it.
Do you submit permits on my behalf?
Yes — for an itemized fee, we file the permit package directly with the AHJ, handle correction cycles, and shepherd the set through to issuance. Or you can take the finished set and submit it yourself. Your call; either way, the drawing scope is the same.
What is your revision policy?
Every fixed-fee quote includes two rounds of revisions before construction documents are finalized. On a standard quote, our answers to the city’s comments on items in our scope are included, and if the city flags an error in our drawings, we fix it free. Substantive scope changes after CD freeze are quoted separately, as a fixed price, before the work starts.
Can you work with my existing GC, engineer, or interior designer?
Yes. We routinely coordinate with general contractors, structural / MEP engineers, kitchen designers, and interior designers your team has already retained. We work in their CAD format, attend their coordination meetings, and produce drawings that bid cleanly against their scope.
How fast can you turn around a set?
A Permit-Ready set typically takes 4–6 weeks from a complete brief. Your delivery date is in writing on the quote.
What languages do you work in?
This website is in English, Spanish, and Chinese, and your proposal, agreement, estimates, and invoices can also be shown in Chinese (the English version governs). We can issue drawing sets bilingually if your trade contractors prefer Spanish — useful in Phoenix, Las Vegas, and Texas markets.
What insurance do you carry, and who is responsible if a drawing error causes a problem during construction?
We carry general liability insurance, and we re-cut any drawing issue we caused at no charge. Because we are a drafting studio, any sheet that needs an engineer’s seal is prepared or directly supervised, and sealed, by an independent registered engineer who carries their own professional (errors-and-omissions) liability for that work. Ask us for our certificate of insurance before you sign.
Do I own the drawings, and can I get the editable CAD files?
You receive the permit-ready set you paid for, and your contract spells out your rights to the files. If you need the native, editable CAD (DWG) — to hand to a builder, a sub, or another firm — tell us during intake so we confirm the deliverable format up front rather than at handoff.
What do you need from me to get started, and how much is the deposit?
To quote, we need your project basics: the location or parcel, your scope, and any survey, existing plans, or even a rough sketch. Engagements start with a deposit at contract signing — paid by card, ACH, or check through the client portal — with the balance tied to project milestones. You do not need an architect's drawings to begin; we work from a napkin sketch or pick up an architect's earlier design.
Can you tell me what my project will cost to build, not just to draw?
We don't quote construction costs — that's your general contractor's bid, and it depends on finishes, site conditions, and the current local labor and material market. We design to a clear, complete scope so your GC can price it tightly with fewer surprises, and we can connect you with GC partners for a build estimate.
MEP COORDINATION
Working with MEP engineers? We'll coordinate.
Contact
Begin a project.
Studio
Phoenix4435 E Chandler Blvd · Suite 200
Phone
(602) 628-1231Servicios disponibles en español · 中文版本 (602) 628-1231



