Skip to main content

TERMS

Terms of service.

Last updated: 2026-11-06

These terms govern your use of the Archipartners Design website and the public services it offers (the AI intake bot, contact and quote forms, and the read-only client portal). By using the site you agree to the terms below. If you do not agree, please do not use the site.

Use of the website

This website is an informational marketing site for Archipartners Design (the "Studio"). It exists to help prospective clients understand what we do, request a quote, look at recent work, and (for existing clients) check the status of an active project.

You agree to use the site lawfully and not to attempt to interfere with its operation, scrape it at volumes that strain our hosting, reverse-engineer non-public APIs, or use it to harass, defame, or impersonate anyone.

Intellectual property

The Studio retains copyright and all other intellectual-property rights in the renderings, drawings, photographs, plan sets, written copy, and brand assets shown on this site, except where a specific item is credited otherwise (e.g., third-party photography licensed for editorial use).

You may view, print, and share individual pages for personal or evaluation purposes. You may not republish, redistribute, or use Studio content for commercial purposes without written permission.

When you submit information through a contact form, the AI intake bot, or any other intake surface, you grant the Studio a perpetual, royalty-free license to use that information internally to follow up about your project, prepare a quote, and (subject to the Privacy Policy) keep records of the conversation.

Disclaimers

Renderings, plan thumbnails, and similar visual material on this site are illustrative concept references unless explicitly marked as documentary photographs of a built or permitted project. They are not construction documents.

Fee estimates, the cost-estimator tool, and any ranges quoted by the AI intake bot are non-binding ballpark figures. They are not contractual quotes. A binding fee for any specific scope of work is established only by a signed engagement letter or proposal between the Studio and the client.

Information on this site does not constitute professional architectural, engineering, or legal advice. Code references are summarized for clarity and may be outdated; always confirm with a current code edition and the relevant Authority Having Jurisdiction.

The Studio provides this site on an "as is" basis without warranties of any kind, express or implied, including merchantability, fitness for a particular purpose, or non-infringement. We do our best to keep the site accurate and online but cannot guarantee uptime or zero errors.

Limitation of liability

To the maximum extent permitted by law, the Studio is not liable for any indirect, incidental, special, consequential, or punitive damages arising out of or related to your use of the site.

In no event shall the Studio’s total cumulative liability arising out of or relating to the site exceed one hundred United States dollars ($100). For paid engagements with signed proposals, the liability terms in the proposal supersede this cap.

Governing law

These terms are governed by the laws of the State of Arizona, without regard to its conflict-of-laws principles.

Dispute resolution

If a dispute arises, you and the Studio agree to first attempt to resolve it through good-faith negotiation. If negotiation fails after thirty (30) days, the dispute will be resolved exclusively in the state or federal courts located in Maricopa County, Arizona, and you consent to personal jurisdiction in those courts.

Modifications

We may update these terms from time to time. The updated date appears below. By continuing to use the site after a change, you agree to the updated terms; if you do not agree, please discontinue use of the site.

Contact

Questions about these terms? Email contact@archipartnersdesign.com.

Terms of Service — Archipartners Design · Archipartners Design