Service · RES.03
Custom homes
From schematic to permit-ready set. Full-house, additions, ADUs.
HOW WE WORK
Fixed fee
Quoted before we draw
Code sheet
Opens every set
Fixed free
Errors in our drawings
50 states
Projects we take
EN · ES · 中
Languages
What we do
Ground-up residential — 1,800 to 12,000 sf. We start with your site survey and a conversation about how you actually live, then build a permit-ready set the local AHJ has already seen the format of.
- Schematic → DD → CDs in three structured passes
- IRC 2024 + Phoenix overlay compliance built in
- IECC energy compliance for climate zone 2B (the edition your city has adopted)
- Structural and MEP coordination with independent registered engineers
What you get
- Permit-ready CD set; any engineering the city requires is prepared and sealed by independent registered professionals
- Coordinated MEP package ready for sub bids
- Door / window / finish schedule and details
- Site plan with grading, drainage, setbacks
- 3D massing study for the planning department
- Plan-check response support, included
Phoenix specifics
Phoenix overlays and HOA design review are where most custom homes get stuck. We pre-clear height, FAR, and setbacks against R1-6 / R1-8 / R1-10 zoning before a single sheet is drawn, and we keep a checklist for each city, built from the correction comments reviewers have actually sent us.
Pricing
Fixed fee. New homes up to 3,000 sf from $14,950, additions from $5,500, renovations with a full drawing set from $7,950. Structural engineering is a separate line on your quote.
FAQ
Frequently asked questions
How detailed is the construction document set?
Permit-ready CDs include floor plans, elevations, sections, roof framing, electrical, plumbing, mechanical, structural notes, and details necessary for the AHJ and a competent GC to build the home. We don't produce full structural calcs — those are prepared and sealed by an independent registered structural engineer (a separate line on your quote).
Do you handle Title 24 / energy compliance?
For CA, NV, and AZ projects we produce energy compliance documentation through independent energy consultants. The cost varies by jurisdiction and is itemized on the quote.
Can you work from a napkin sketch, or do I need an architect for SD/DD?
Both. We can take a hand sketch + program brief and produce the schematic, design development, and CDs ourselves. Or, if you've already engaged an architect for SD/DD, we take their drawings to permit-ready CDs.
Do you do interior elevations and millwork?
Standard interior elevations (kitchens, baths, built-ins) are in scope. Detailed millwork shop drawings are typically produced by your cabinet shop; we produce the architectural intent drawings that the shop uses.
Do you stamp drawings?
No — we are a drafting studio, not a registered architecture or engineering firm, and we never apply a seal. Where a project needs an engineer’s seal, an independent engineer registered in your state is responsible for that part of the work: they prepare it, or directly supervise its preparation, and seal it. Engineering and seals, where your city requires them, are separate lines on your quote, so there are no surprises. If a project needs a registered architect, we refer you to one instead of taking it.
Do you submit permits on my behalf?
Yes — for an itemized fee, we file the permit package directly with the AHJ, handle correction cycles, and shepherd the set through to issuance. Or you can take the finished set and submit it yourself. Your call; either way, the drawing scope is the same.
What is your revision policy?
Every fixed-fee quote includes two rounds of revisions before construction documents are finalized. On a standard quote, our answers to the city’s comments on items in our scope are included, and if the city flags an error in our drawings, we fix it free. Substantive scope changes after CD freeze are quoted separately, as a fixed price, before the work starts.
Can you work with my existing GC, engineer, or interior designer?
Yes. We routinely coordinate with general contractors, structural / MEP engineers, kitchen designers, and interior designers your team has already retained. We work in their CAD format, attend their coordination meetings, and produce drawings that bid cleanly against their scope.
How fast can you turn around a set?
A Permit-Ready set typically takes 4–6 weeks from a complete brief. Your delivery date is in writing on the quote.
What languages do you work in?
This website is in English, Spanish, and Chinese, and your proposal, agreement, estimates, and invoices can also be shown in Chinese (the English version governs). We can issue drawing sets bilingually if your trade contractors prefer Spanish — useful in Phoenix, Las Vegas, and Texas markets.
What insurance do you carry, and who is responsible if a drawing error causes a problem during construction?
We carry general liability insurance, and we re-cut any drawing issue we caused at no charge. Because we are a drafting studio, any sheet that needs an engineer’s seal is prepared or directly supervised, and sealed, by an independent registered engineer who carries their own professional (errors-and-omissions) liability for that work. Ask us for our certificate of insurance before you sign.
Do I own the drawings, and can I get the editable CAD files?
You receive the permit-ready set you paid for, and your contract spells out your rights to the files. If you need the native, editable CAD (DWG) — to hand to a builder, a sub, or another firm — tell us during intake so we confirm the deliverable format up front rather than at handoff.
What do you need from me to get started, and how much is the deposit?
To quote, we need your project basics: the location or parcel, your scope, and any survey, existing plans, or even a rough sketch. Engagements start with a deposit at contract signing — paid by card, ACH, or check through the client portal — with the balance tied to project milestones. You do not need an architect's drawings to begin; we work from a napkin sketch or pick up an architect's earlier design.
Can you tell me what my project will cost to build, not just to draw?
We don't quote construction costs — that's your general contractor's bid, and it depends on finishes, site conditions, and the current local labor and material market. We design to a clear, complete scope so your GC can price it tightly with fewer surprises, and we can connect you with GC partners for a build estimate.
CUSTOM HOMES · ALL 50 STATES
Drawing your home? Let's start.
Contact
Begin a project.
Studio
Phoenix4435 E Chandler Blvd · Suite 200
Phone
(602) 628-1231Servicios disponibles en español · 中文版本 (602) 628-1231



