跳到主内容

服务 · MEP.06

MEP 协调

我们不盖 MEP 章 — 我们协调 MEP。分包管理、冲突检测。

全美承包商信赖

  • 200+

    已提交许可图集

  • 50

    覆盖州数

  • 8

    从业年数

  • 14 天

    典型交付时间

  • EN · ES · 中

    工作语言

我们做什么

MEP 是制图最常见的失败点。我们不盖 MEP 章 — 我们协调 MEP。我们将负荷算到 Manual J/D/S 置信度水平,为工程师撰写工作范围,在建筑底图与 MEP 之间做冲突检测,交给总承包商一份能真正建出来的图集。

  • Manual J/D/S 负荷计算与 HVAC 叙述
  • 协调分包工作范围撰写
  • 建筑底图上的冲突检测
  • IECC 2024 合规路径

您得到什么

  • 可供 MEP 制图的建筑底图
  • 负荷计算汇总与 HVAC 叙述
  • IECC 合规工作表
  • 给排水固定单位计数与燃气需量
  • 电气服务规模计算与配电板表范围
  • 合并图集上的冲突检测报告

当地细节

亚利桑那气候区2意味着以制冷为主的负荷曲线和 IECC 2024 下严格的围护结构阈值。我们选择能将修改最小化的规范路径或性能路径,并清楚镇上哪些机械工程师快、哪些细致 — 我们据此搭档。

报价

典型项目区间:$2,500–$9k。多数项目为固定费用。

问答

常见问题

  • What does "MEP coordination" include exactly?

    Coordinating mechanical (HVAC), electrical, and plumbing layouts between the trade engineers and the architectural set so nothing collides on site. We mark conflicts (a duct routed through a beam, a plumbing chase too small for the riser, a panel feeder that needs a new circuit), issue RFIs to the relevant trade, and incorporate resolved decisions into the architectural drawings.

  • Do you do MEP design from scratch, or only coordinate?

    Both, depending on the project. Small commercial TI: we produce permit-set MEP layouts ourselves with our partner stamped MEP engineer reviewing. Larger commercial / multifamily: each MEP trade is its own design firm; we coordinate their drawings, not produce them.

  • Can you join my project's coordination meetings?

    Yes — typically a weekly 30-minute call during the active coordination phase. Included in the fee for projects we're producing the architectural set on; itemized on the quote for coordination-only engagements.

  • Do you stamp drawings?

    We are a drafting studio, not a licensed architecture or engineering firm. For projects that need a stamp, we partner with licensed architects and engineers in your state and route the drawings through them. The cost of the stamp is itemized separately on your quote so there are no surprises.

  • Do you submit permits on my behalf?

    Yes — for an itemized fee, we file the permit package directly with the AHJ, handle correction cycles, and shepherd the set through to issuance. Or you can take the stamped set and submit it yourself. Your call; either way, the drawing scope is the same.

  • What is your revision policy?

    Every fixed-fee quote includes two rounds of revisions before construction documents are finalized. AHJ corrections (changes the city asks for after submittal) are bundled in — we don't charge extra for plan-check responses. Substantive scope changes after CD freeze are quoted separately at the hourly rate.

  • Can you work with my existing GC, engineer, or interior designer?

    Yes — most of our projects come in this way. We routinely coordinate with general contractors, structural / MEP engineers, kitchen designers, and interior designers your team has already retained. We work in their CAD format, attend their coordination meetings, and produce drawings that bid cleanly against their scope.

  • How fast can you turn around a set?

    Typical permit-set turnaround is 2–5 weeks from a complete brief; complex commercial TI or multifamily can stretch to 8–12 weeks. We commit to dates in writing on the quote and hold them — late-delivery credits are part of the contract.

  • What languages do you work in?

    English, Spanish, and Mandarin. Drafters in all three on staff. We can issue drawing sets bilingually if your trade contractors prefer Spanish — useful in Phoenix, Las Vegas, and Texas markets.

MEP 协调

在协调MEP分包?我们来组织。

联系

开始一个项目。

工作室

Phoenix4435 E Chandler Blvd · Suite 200

提供英语 · 西班牙语 · 中文服务。 (602) 628-1231

MEP 协调 — 建筑制图 · 全美50州 · Archipartners Design