跳到主内容

服务 · PMT.02

申报加速

IBC/IRC/IECC 规范审查、审图回复、与审图机构联络。

全美承包商信赖

  • 200+

    已提交许可图集

  • 50

    覆盖州数

  • 8

    从业年数

  • 14 天

    典型交付时间

  • EN · ES · 中

    工作语言

我们做什么

您有图集。您有修改清单。您没时间。我们接手,撰写审图员想看到的回复叙述,按其格式标注图页,然后亲自跟进重新提交。专精全美各州修订与本地叠加规范。

  • 审图修改回复,书面与图示
  • 与审图机构联络 — 我们认识审图员
  • 专精各州修订与本地叠加规范
  • 重新提交全程跟进,已包含

您得到什么

  • 逐条书面回复叙述
  • 按审图员意见标注的图页
  • 注明章节号的规范引用
  • 可提交的重新提交包
  • 引导至正确审图员队列
  • 许可签发后的关闭报告

当地细节

我们处理凤凰城 DSD、Maricopa 县、Mesa、Tempe、Scottsdale、Chandler、Glendale、Gilbert、Surprise 的队列。我们了解每位审图员的风格 — 有的要盖章信函,有的要图页红线,有的两者都要 — 我们不靠猜。

报价

典型项目区间:$1,800–$6,500。按小时或按修改条目计费。老客户加急免费。

问答

常见问题

  • What AHJs do you file in regularly?

    In Arizona: Phoenix, Scottsdale, Tempe, Mesa, Chandler, Glendale, Gilbert, Tucson, Maricopa County, Pima County. Outside AZ: Los Angeles (city + county), Las Vegas / Clark County, Reno, Austin, San Antonio, Houston, Dallas, Denver. New AHJs we file in get an upfront jurisdictional research line on the quote (typically $250–$500) so we don't guess on their submittal portal or correction format.

  • How fast is "permit expediting"?

    We can't make the AHJ review faster — what we do is keep the package clean enough to avoid corrections and respond to corrections within 24 hours when they come. For Phoenix TI typical: first submittal to issuance averages 4–6 weeks. We track the AHJ's queue and follow up on day 1 of every published turnaround.

  • What happens if my permit gets rejected on first review?

    We respond to corrections at no extra fee — that's in the fixed-fee scope. The only extras are if the AHJ asks for substantive new scope (e.g., adds a structural review requirement that wasn't in the original) — those are quoted separately, transparently.

  • Do you stamp drawings?

    No — we are a drafting studio, not a registered architecture or engineering firm, and we never apply a seal. Where a project needs one, an independent architect or engineer registered in your state is responsible for that part of the work: they prepare it, or directly supervise its preparation, and seal it. Their fee is itemized separately on your quote so there are no surprises.

  • Do you submit permits on my behalf?

    Yes — for an itemized fee, we file the permit package directly with the AHJ, handle correction cycles, and shepherd the set through to issuance. Or you can take the finished set and submit it yourself. Your call; either way, the drawing scope is the same.

  • What is your revision policy?

    Every fixed-fee quote includes two rounds of revisions before construction documents are finalized. AHJ corrections (changes the city asks for after submittal) are bundled in — we don't charge extra for plan-check responses. Substantive scope changes after CD freeze are quoted separately at the hourly rate.

  • Can you work with my existing GC, engineer, or interior designer?

    Yes — most of our projects come in this way. We routinely coordinate with general contractors, structural / MEP engineers, kitchen designers, and interior designers your team has already retained. We work in their CAD format, attend their coordination meetings, and produce drawings that bid cleanly against their scope.

  • How fast can you turn around a set?

    Typical permit-set turnaround is 2–5 weeks from a complete brief; complex commercial TI or multifamily can stretch to 8–12 weeks. We commit to dates in writing on the quote and hold them — late-delivery credits are part of the contract.

  • What languages do you work in?

    English, Spanish, and Mandarin. Drafters in all three on staff. We can issue drawing sets bilingually if your trade contractors prefer Spanish — useful in Phoenix, Las Vegas, and Texas markets.

  • What insurance do you carry, and who is responsible if a drawing error causes a problem during construction?

    We carry general liability insurance, and we re-cut any drawing issue we caused at no charge. Because we are a drafting studio, any sheet that needs a professional seal is prepared or directly supervised, and sealed, by an independent registered engineer or architect who carries their own professional (errors-and-omissions) liability for that work. Ask us for our certificate of insurance before you sign.

  • Do I own the drawings, and can I get the editable CAD files?

    You receive the permit-ready set you paid for, and your contract spells out your rights to the files. If you need the native, editable CAD (DWG) — to hand to a builder, a sub, or another firm — tell us during intake so we confirm the deliverable format up front rather than at handoff.

  • What do you need from me to get started, and how much is the deposit?

    To quote, we need your project basics: the location or parcel, your scope, and any survey, existing plans, or even a rough sketch. Engagements start with a deposit at contract signing — paid by card, ACH, or check through the client portal — with the balance tied to project milestones. You do not need an architect's drawings to begin; we work from a napkin sketch or pick up an architect's earlier design.

  • Can you tell me what my project will cost to build, not just to draw?

    We don't quote construction costs — that's your general contractor's bid, and it depends on finishes, site conditions, and the current local labor and material market. We design to a clear, complete scope so your GC can price it tightly with fewer surprises, and we can connect you with GC partners for a build estimate.

申报加速

卡在审图阶段?我们帮您解套。

24小时内回复 · 固定报价 · 无预付款

联系

开始一个项目。

工作室

Phoenix4435 E Chandler Blvd · Suite 200

提供英语 · 西班牙语 · 中文服务。 (602) 628-1231

申报加速 — 建筑制图 · 全美50州 · Archipartners Design