全美承包商信赖
200+
已提交许可图集
50
覆盖州数
8
从业年数
14 天
典型交付时间
EN · ES · 中
工作语言
我们做什么
大部分租赁改造的失败点不是设计,而是规范分析。我们先做使用类别与改用途审查,再为审图员构建出口与无障碍叙述,然后才开始制图。您提交的图集,就是盖章回来的图集。
- 前期使用类别与改用途规范分析
- 依 IBC 2024 编制出口、无障碍、防火等级图页
- 与分包工程师协调的MEP红线包
- 申报图集 + 审图回复,固定费用
您得到什么
- 附规范分析图页的盖章申报图集
- 拆除图与关键拆除注释表
- 反映吊顶图,标注防火等级
- ADA 与无障碍合规包
- 协调好的 MEP 红线(我们不盖 MEP 章)
- 审图回复在五个工作日内完成
当地细节
熟悉格式后,凤凰城 DSD 流程很快。我们提交预审好的TI图集,直接进入正确审图员的队列(符合条件时走快通道),并保留一份每位审图员关注点的小抄。Mesa、Tempe、Scottsdale、Chandler — 同一套打法,不同的表格。
报价
典型项目区间:$4k–$18k。多数为固定费用。租赁改造起价 $4,500。
问答
常见问题
Do you handle hood, grease interceptor, and fire-suppression layouts?
Yes — Type I hood placement, make-up air sizing, grease-interceptor sizing per local plumbing code, and fire-suppression nozzle mapping are routine on restaurant TIs. The actual fire-suppression system is designed by a licensed fire-protection contractor (we coordinate); the rest is in our scope.
Can you do plumbing and electrical layouts for a TI?
We produce permit-set plumbing + electrical layouts for the architectural drawing set. Load calcs and panel schedules that require an MEP engineer's stamp are routed through our partner MEPs — itemized on the quote.
What if my landlord requires their architect to approve changes?
Common in most commercial leases. We produce the drawings, submit to your landlord's architect of record for sign-off, and revise as needed. The drawing scope doesn't change; we just add a landlord-coordination line to the schedule (typically adds 1–2 weeks).
Do you do as-built measurement of the existing space?
Yes — for an itemized fee. Phoenix-area TIs we measure ourselves; outside Phoenix we can subcontract a local measurer or work from your existing as-builts if they're accurate enough (we verify a sample before relying on them).
Do you stamp drawings?
We are a drafting studio, not a licensed architecture or engineering firm. For projects that need a stamp, we partner with licensed architects and engineers in your state and route the drawings through them. The cost of the stamp is itemized separately on your quote so there are no surprises.
Do you submit permits on my behalf?
Yes — for an itemized fee, we file the permit package directly with the AHJ, handle correction cycles, and shepherd the set through to issuance. Or you can take the stamped set and submit it yourself. Your call; either way, the drawing scope is the same.
What is your revision policy?
Every fixed-fee quote includes two rounds of revisions before construction documents are finalized. AHJ corrections (changes the city asks for after submittal) are bundled in — we don't charge extra for plan-check responses. Substantive scope changes after CD freeze are quoted separately at the hourly rate.
Can you work with my existing GC, engineer, or interior designer?
Yes — most of our projects come in this way. We routinely coordinate with general contractors, structural / MEP engineers, kitchen designers, and interior designers your team has already retained. We work in their CAD format, attend their coordination meetings, and produce drawings that bid cleanly against their scope.
How fast can you turn around a set?
Typical permit-set turnaround is 2–5 weeks from a complete brief; complex commercial TI or multifamily can stretch to 8–12 weeks. We commit to dates in writing on the quote and hold them — late-delivery credits are part of the contract.
What languages do you work in?
English, Spanish, and Mandarin. Drafters in all three on staff. We can issue drawing sets bilingually if your trade contractors prefer Spanish — useful in Phoenix, Las Vegas, and Texas markets.
租赁改造



