全美承包商信赖
200+
已提交许可图集
50
覆盖州数
8
从业年数
14 天
典型交付时间
EN · ES · 中
工作语言
我们做什么
在多户住宅中,小小的制图错误会变成六位数的问题。Type V-A、Type III-A、平台层、隔户墙、防火等级组件 — 我们以城市希望看到的方式绘制,在每一张图上注明组件和已测试列表参考。
- Type V-A 与 Type III-A 建造经验
- 附 UL 列表的防火等级组件表
- IBC 2024 出口、分隔与无障碍
- 平台层与 4-over-1 详图
您得到什么
- 协调好的多页申报图集
- 出口与生命安全分析图页
- 附 UL 参考的墙/楼板/吊顶组件表
- 单元配比与无障碍分布图
- 土建与景观协调标注
- 所有审图队列的回复
当地细节
凤凰城中高层在某些走廊意味着 Walkable Urban Code 叠加或 TOD 区划。我们按区划预先验证容积率、高度奖励与停车比。Glendale、Mesa、Tempe 各有自己的多户住宅审查通道;我们知道哪条最快。
报价
典型项目区间:$14k–$60k。按单元数分级。双拼起价 $14k。
问答
常见问题
Up to what size — duplex, fourplex, 12-unit, larger?
We routinely produce sets for duplex through 24-unit Type V buildings. Larger Type III/V mid-rise (4–6 stories) needs a registered architect of record and a structural engineer, who are responsible for that work; we can draft for the architect, under their direct supervision.
Do you do FFHA / ADA accessibility?
Fair Housing Act compliance for the ground-floor units is built into every multifamily set we produce. Full-on ADA for common areas and the accessible-unit count required by your jurisdiction we include in the scope; we flag the specific unit count at schematic.
Can you handle a Type V over podium?
Yes — a common pattern in Phoenix, Vegas, and Denver markets. The podium structural design is by an independent registered structural engineer, and a registered architect of record is responsible for the building where the state requires one; we draft under their direction.
Will you steer me to the cheapest compliant code path — the right construction type so I don't trigger sprinklers or a podium I didn't budget for?
Yes. Your written code-strategy memo, delivered before the quote, maps the construction-type, occupancy, and threshold decisions — sprinkler triggers, fire separations, podium — so we design the cheapest compliant path rather than just drawing what you hand us. Fair Housing Act compliance for ground-floor units and ADA for common areas are built into every multifamily set.
Do you stamp drawings?
No — we are a drafting studio, not a registered architecture or engineering firm, and we never apply a seal. Where a project needs one, an independent architect or engineer registered in your state is responsible for that part of the work: they prepare it, or directly supervise its preparation, and seal it. Their fee is itemized separately on your quote so there are no surprises.
Do you submit permits on my behalf?
Yes — for an itemized fee, we file the permit package directly with the AHJ, handle correction cycles, and shepherd the set through to issuance. Or you can take the finished set and submit it yourself. Your call; either way, the drawing scope is the same.
What is your revision policy?
Every fixed-fee quote includes two rounds of revisions before construction documents are finalized. AHJ corrections (changes the city asks for after submittal) are bundled in — we don't charge extra for plan-check responses. Substantive scope changes after CD freeze are quoted separately at the hourly rate.
Can you work with my existing GC, engineer, or interior designer?
Yes — most of our projects come in this way. We routinely coordinate with general contractors, structural / MEP engineers, kitchen designers, and interior designers your team has already retained. We work in their CAD format, attend their coordination meetings, and produce drawings that bid cleanly against their scope.
How fast can you turn around a set?
Typical permit-set turnaround is 2–5 weeks from a complete brief; complex commercial TI or multifamily can stretch to 8–12 weeks. We commit to dates in writing on the quote and hold them — late-delivery credits are part of the contract.
What languages do you work in?
English, Spanish, and Mandarin. Drafters in all three on staff. We can issue drawing sets bilingually if your trade contractors prefer Spanish — useful in Phoenix, Las Vegas, and Texas markets.
What insurance do you carry, and who is responsible if a drawing error causes a problem during construction?
We carry general liability insurance, and we re-cut any drawing issue we caused at no charge. Because we are a drafting studio, any sheet that needs a professional seal is prepared or directly supervised, and sealed, by an independent registered engineer or architect who carries their own professional (errors-and-omissions) liability for that work. Ask us for our certificate of insurance before you sign.
Do I own the drawings, and can I get the editable CAD files?
You receive the permit-ready set you paid for, and your contract spells out your rights to the files. If you need the native, editable CAD (DWG) — to hand to a builder, a sub, or another firm — tell us during intake so we confirm the deliverable format up front rather than at handoff.
What do you need from me to get started, and how much is the deposit?
To quote, we need your project basics: the location or parcel, your scope, and any survey, existing plans, or even a rough sketch. Engagements start with a deposit at contract signing — paid by card, ACH, or check through the client portal — with the balance tied to project milestones. You do not need an architect's drawings to begin; we work from a napkin sketch or pick up an architect's earlier design.
Can you tell me what my project will cost to build, not just to draw?
We don't quote construction costs — that's your general contractor's bid, and it depends on finishes, site conditions, and the current local labor and material market. We design to a clear, complete scope so your GC can price it tightly with fewer surprises, and we can connect you with GC partners for a build estimate.
多户住宅


