返回作品集项目 · 010
DETACHED GARAGE PERMIT SET · GOODYEAR, AZ · MMXXV
Goodyear Detached Garage
Plan-aligned permit set for a detached residential garage. Two-car bay with finished interior — workbench wall, tool-storage system, polished concrete floor, ceiling-mounted lighting, rear personnel door for yard access. Coordinated with the property’s primary structure for setbacks and accessory-structure code compliance.
图集
点击任意照片查看完整尺寸。
