Skip to main content
Back to portfolioProject · 025

ADU — RENDERING · CONCEPT DESIGN · MMXXV

Elevated Modern ADU

An elevated modern accessory dwelling unit raised on slender posts over a carport/storage level, rendered from the firm’s front elevation: an open deck with a slim metal railing reached by a side stair, a low metal gable roof, warm board-and-batten wood siding, and black-framed glazing wrapping the living level. Shown as a modern ADU design concept.

Have a similar project?

Tell us about it.

Begin a project →
Elevated Modern ADU · ADU — Rendering · Concept Design · Archipartners Design