Skip to main content
Back to portfolioProject · 035

BATHROOM RENOVATION — RENDERING · PEORIA, AZ · MMXXVI

Peoria Accessible Bath Renovation

A hall bathroom rebuilt for easy, accessible everyday use. A curbless walk-in shower behind a single glass panel, a wall-hung sink with a recessed mirror cabinet that keeps the floor clear, and grab bars placed as part of the design rather than added later. Marble-look porcelain on the floor and shower walls keeps the room bright and seamless.

Have a similar project?

Tell us about it.

Begin a project →
Peoria Accessible Bath Renovation · Bathroom Renovation — Rendering · Peoria, AZ · Archipartners Design