Skip to main content
Back to portfolioProject · 033

WELLNESS TI — RENDERING · PEORIA, AZ · MMXXV

Peoria Pilates Studio TI

A shell suite turned into a calm, light-filled pilates studio. A long reformer room runs beside an open mat and suspension zone, a full-height mirror wall and black-framed glass partitions keep every room bright and connected, and a pale herringbone floor with a walnut chevron inlay ties the space together. Reception and a bench lounge sit right at the entry, with a private training room behind glass.

Have a similar project?

Tell us about it.

Begin a project →
Peoria Pilates Studio TI · Wellness TI — Rendering · Peoria, AZ · Archipartners Design