Back to portfolioProject · 037
GARAGE RENOVATION — RENDERING · PHOENIX, AZ · MMXXVI
Phoenix Garage Renovation
A two-car garage reworked with a covered entry and a built-in mudroom. Two matching glass-topped garage doors sit under a board-and-batten gable with exposed rafter tails, while a brick base and slim white columns frame an entry bay with its own door. Inside, a bench, cubbies, coat hooks and tall cabinets turn the drop zone into everyday storage, warmed by a wood slat panel.
Gallery
Click any photo to view full size.
