FIELD GUIDES
Run the checks before you pay for plans.
Free guides for homeowners and business owners. Each one lists the checks to run, and the signs to stop, before you spend money on drawings. Every fact links to the city or state page it came from.
Not sure which guide?
Add space or a second home
Checks for your lot and your house before you pay for plans.
Business spaces
Checks to run on a space before you sign the lease.
FAQ
Frequently asked questions
Are the guides free?
Yes. Every guide is free to read, with no sign-up needed to open it.
Which guide should I start with?
Pick the section that matches your situation: adding space or a second home, a letter from the city or unpermitted work, or leasing or converting a business space. Each guide opens with a short list of yes / no checks to run before you pay for plans.
Do you draw the work in these guides?
It depends on the guide. We draw the ones tagged "We draw this". The ones tagged "We refer this to an architect" go to a registered architect, and we point you to one. Send us the address and we reply within one business day.
Where do the facts come from?
From the city's or state's own web pages. Each fact links to its source and shows the month it was checked. Rules change, so confirm with your city before you act.
What languages are the guides in?
The Field Guides are in English, Spanish and Chinese. The Restaurant Conversion guide is in English and Spanish.
Contact
Begin a project.
Studio
Phoenix4435 E Chandler Blvd · Suite 200
Phone
(602) 628-1231Servicios disponibles en español · 中文版本 (602) 628-1231