Skip to main content

FIELD GUIDE

ADU / Casita Field Guide: can my lot take one?

Twelve checks, the stop signs, and the rules of seven Phoenix-area cities, before you pay for plans.

Arizona law makes it easier to add a small second home on your lot. It does not make every lot work. Your HOA, a utility easement, your septic tank or your city’s own rules can still stop the job. Run these checks first. Every fact links to an official page, and where a city page does not say, we tell you to ask.

Updated November 23, 2026 · Free · one email with the link

Built from the city pages of Phoenix, Mesa, Scottsdale, Chandler, Gilbert, Tempe, Glendale. Anywhere else, check your own city’s page.

One email with the link. We don’t sell your address; you can unsubscribe with one click.

5-MINUTE GO / NO-GO

Answer these before you spend money.

Each check is a yes or no. A “no” or a “don’t know” is something to settle first.

  1. Is your lot a single-family lot that already has a house on it?

    State law requires cities to allow an ADU where a single-family home is allowed. Phoenix, Tempe and Glendale do not allow one on a duplex or triplex lot, and Gilbert does not let the ADU come before the main home. A no here is a stop.1,4,21,24,18

  2. Does your HOA or deed restriction allow it, in writing?

    State law does not cancel private HOA rules or deed covenants. A city just cannot make your permit depend on one. If the HOA bans ADUs, you cannot build, even when the city says yes. Get the answer in writing before you spend money.1,9,21

  3. Is your lot inside a city the state law covers, and outside the exempt areas?

    The state rule covers cities and towns with more than 75,000 people. All seven cities in this guide are above that line. It does not cover tribal land, land near military airports, or land in certain airport noise zones (above 65 decibels). If you are near an airport, ask your city.1,11

  4. Does the size you want fit under the cap?

    The state cap is the lesser of 75% of the main home’s gross floor area or 1,000 sq ft. Your city may allow more on a large lot (Phoenix over 10,000 sq ft, Tempe on an acre or more). Lot coverage still counts the ADU. Do the math with your own house size.1,4,21

  5. Can it sit where you want it, with the setbacks your city uses?

    State law bars a rear or side setback above 5 ft. Cities still set the front setback, height and coverage by zone. Scottsdale does not let a detached ADU sit in a front or side yard, and wants 10 ft between it and the house. Draw the lot first.1,11,4,9

  6. Is there a utility easement under the spot you picked?

    An ADU may not be built on a current or planned public utility easement without written consent from each utility that uses it. Pull your plat and any recorded easements before you draw. No consent means the ADU goes somewhere else.1,19

  7. Do you know how water, sewer and electric will work in your city?

    Cities differ. Glendale requires separate meters, including a new city water tap. Chandler requires the same providers and meters as the main home. Phoenix allows one water service connection for the ADU. Gilbert makes a second electric meter optional. Scottsdale requires separately metered electric. Mesa allows separate meters or sub-meters with permits. Price the job for your city.24,14,7,18,11,9

  8. If you are on a septic tank, has the county said it can handle another home?

    None of the seven city ADU pages deal with septic. Septic systems are a county matter in Maricopa County, and added bedrooms or fixtures go to Maricopa County Environmental Services. Ask the county before you draw.26

  9. If you are converting an existing garage, shed or guest house, is it permitted and legal today?

    Phoenix wants unpermitted buildings legalized first. Scottsdale does not grandfather old guest houses or unpermitted ADUs. Tempe counts existing guest quarters toward the ADU total, and Glendale applies every ADU rule to a converted building. An old structure can be a problem, not a shortcut.4,12,21,24

  10. Do you have a plan for parking?

    A city cannot require extra parking or a fee in place of it for the ADU. The main home keeps its own parking, though. Mesa wants two spaces to stay for the main home, and Phoenix wants replacement parking elsewhere on the lot if you convert a garage or carport.1,9,4

  11. Does your rental plan match your city’s rules?

    A city cannot ban long-term rental of the ADU. Short-term rental rules differ by city. Scottsdale allows it only with the owner on site. Phoenix and Tempe require the owner to live on site for newer ADUs used as short-term rentals. Mesa requires a license. Mesa, Scottsdale and Glendale do not allow selling the ADU apart from the house.1,12,5,21,9,24

  12. Do you know which building code edition your city enforces?

    Cities enforce different editions of the International Residential Code (IRC): 2024 in Phoenix, Mesa, Chandler and Glendale, 2021 in Scottsdale, 2018 in Gilbert, and Tempe takes either 2018 or 2024 through 2026, then 2024 only. The 2024 edition renumbered some sections. In it, smoke alarms are R310, carbon monoxide alarms R311 and bedroom escape openings R319. A city may not require a fire sprinkler system or commercial building code for an ADU.8,10,17,25,13,20,23,1

STOP SIGNALS

If you see any of these, pause.

  • Your HOA or deed bans ADUs

    The state law and your city’s rules do not override a private covenant. If the HOA says no, the answer is no until the HOA changes it.1,9,21

  • A utility easement under the footprint

    You need written consent from each utility, or the ADU has to move.1,19,24

  • Tribal land, or land near an airport

    The state rule does not cover tribal land, land near military airports, or land in certain airport noise zones above 65 decibels. Ask your city to check its airport and military overlays.1,11

  • Duplex lot, or no house yet

    Phoenix, Tempe and Glendale do not allow an ADU on a duplex or triplex lot. Gilbert will not let it come before the main home.4,21,24,18

  • Septic that may not take a second home

    Septic is a Maricopa County matter, not the city’s. Ask the county before you draw. On city sewer, Glendale’s separate water tap can mean street work, extra permits and a licensed contractor.26,24

  • The plan is bigger than the cap

    The cap is the lesser of 75% of the main home’s gross floor area or 1,000 sq ft, unless your city allows more on a large lot. Gilbert’s guide mentions a tier above 1,000 sq ft; ask Gilbert Planning before you count on it.1,4,21,18

  • The budget assumes a meter, address or rental the city will not allow

    Chandler requires the same meters as the main home. Glendale requires separate meters but no separate address. Phoenix allows one water connection. Short-term rental needs the owner on site in Scottsdale, and for newer ADUs in Phoenix and Tempe. Check these before you count on rent.14,24,7,12,5,21

  • Special areas and unpermitted buildings

    Hillside, historic and floodplain lots get extra review in Phoenix. Mesa needs a Certificate of Appropriateness in a historic district. Scottsdale does not allow an ADU in natural open space (NAOS). Mesa and Glendale do not accept manufactured homes, RVs or wheeled tiny homes as an ADU.6,9,12,24

WHAT THE CITY WILL ASK FOR

Expect to be asked for these.

  • A zoning step before the building permit

    Glendale wants a Zoning Clearance Letter from Planning before you submit construction documents. Phoenix does site planning approval first, then the residential plan submittal. Scottsdale runs an online pre-application, a pre-application meeting, an administrative application, then the construction plans.24,6,11,12

  • A site plan

    Every city asks for one. Phoenix wants a plot or site plan and does not ask for a grading and drainage plan for an ADU. Tempe asks for a site plan and a floor plan that includes the existing home, and may add grading and drainage. Mesa wants a site plan in the plan set.6,22,9

  • The full plan set

    Mesa’s ADU page asks for a site plan and a code data sheet with the scope of work, and the building department will tell you which plans go with them. Tempe takes construction documents through its Citizen Access Portal.9,22

  • A soils report (Gilbert)

    Gilbert asks for a soils report with the permit submittal, unless your subdivision has one on file or you sign a waiver. The town may also assess development fees at permitting.18

  • Proof of your utility setup

    Expect to show how the ADU gets water, sewer and electric. Utility consent is needed if you sit near an easement. Scottsdale asks for a separate address for the ADU, and Glendale uses a “Unit” suffix on the main address.24,22,11,1

  • Extra reviews for special lots

    Hillside, historic and floodplain lots in Phoenix go through special review. Mesa needs a Certificate of Appropriateness before the building permit in a historic district. Ask early, because these can shape the design.6,9

  • Standard plans, where a city offers them

    Phoenix lists standard ADU plans that must be submitted unchanged and are free to Phoenix residents. At last check they were still in review, so ask the city whether they are ready.3

YOUR CITY’S RULES

Your city’s rules.

Short notes from each city’s own pages. Rules change, so open the linked page for the current text.

  • Phoenix3,1,4,5,7,8

    • Two ADUs per lot. The city says a third may be allowed in some cases; state law requires it on a lot of 1 acre or more when one ADU is deed-restricted affordable. Not allowed on a duplex or triplex lot.
    • Size: up to 10,000 sq ft lots, the lesser of 1,000 sq ft or 75% of the main home. Larger lots have a higher cap.
    • A detached ADU in the rear yard is up to 15 ft high unless you get a use permit. The city’s guide and staff report word the side setbacks differently, so confirm the number with Phoenix before you draw.
    • Short-term rental: owner must live on the property for an ADU with a certificate of occupancy issued on or after September 14, 2024 (effective April 4, 2026).
    • Building code: 2024 IRC with Phoenix amendments.
  • Mesa9,10

    • One attached and one detached ADU on a lot with a single home, in the zones the city lists. Size is the lesser of 1,000 sq ft or 75% of the main home’s habitable floor area.
    • Side and rear setback of at least 5 ft. A two-story detached ADU is allowed on a one-story home if it stays within the district height limit.
    • No extra parking for the ADU, but the main home keeps at least two spaces. The ADU cannot be sold apart from the home.
    • Short-term rental needs a Mesa license. Manufactured homes, RVs and wheeled tiny homes do not count as an ADU.
    • Building code: 2024 International Codes for applications submitted on or after January 8, 2026.
  • Scottsdale11,12,13

    • One attached and one detached ADU on a lot with an existing main home. The first ADU is the lesser of 1,000 sq ft or 75% of the main home; any other ADU is 500 sq ft at most.
    • A detached ADU cannot sit in a required front or side yard. In the rear yard it can be 5 ft from the side and rear lines, with 10 ft between it and the house.
    • Separately metered electric, a separate address and a separate exterior entrance. It cannot be sold apart from the house, and it cannot go in natural open space (NAOS).
    • Scottsdale’s ADU page says the owner must live on the property if the ADU is rented or leased, long or short term. State law limits what cities can require for long-term rentals, so confirm with Scottsdale before you plan on renting.
    • Building code: 2021 IRC with Scottsdale amendments.
  • Chandler14,15,16,17

    • One attached and one detached ADU on a lot where a single-family home is the main use. Size is the lesser of 1,000 sq ft or 75% of the main home.
    • The ADU must use the same water, sewer and electric providers and meters as the main home, and it needs its own independent entrance.
    • The city offers two design paths: a design set out in its ordinance, or one consistent with the main home. It is your choice.
    • Parking and short-term rental rules from an older Chandler ordinance may or may not still apply. Ask Chandler planning before you plan around either. Planner of the Day: 480-782-3050.
    • Building code: 2024 IRC with Chandler amendments.
  • Gilbert18,19,20

    • Allowed in all single-family zoning districts, one attached and one detached. The ADU cannot be built before the main home. Size is up to 75% of the main home.
    • The guide mentions a permit step for an ADU over 1,000 sq ft. Because that sits uneasily with the state cap, ask Gilbert Planning before you plan one.
    • Setback for an ADU of 1,000 sq ft or less: 5 ft for a structure up to 10 ft high, plus one more foot for each foot above that. A second electric meter is optional, and a separate address is optional.
    • Gilbert requires a soils report with the permit, unless a waiver or one on file applies. Separate rental of the ADU is permitted.
    • Building code: the town’s own list shows the 2018 IRC, and its permits page says the 2024 amendments are not adopted yet. Ask the town which edition applies to your application.
  • Tempe21,22,23

    • One attached and one detached ADU on a lot with a single-family home. Duplex and triplex lots are not eligible. Existing guest quarters count toward the total.
    • Size: lots under 1 acre, the lesser of 1,000 sq ft or 75% of the main home. Lots of 1 acre or more, the lesser of 2,000 sq ft or 75%. An ADU capped at 1,000 sq ft is limited to three bedrooms.
    • 5 ft setback at the rear, side and street side. A two-story ADU needs a Use Permit. No extra parking is required.
    • Short-term rental needs a city license, and the owner must live on site for an ADU built on or after December 20, 2024. A unique address is required.
    • Building code: through December 31, 2026 you may use the 2018 or the 2024 adopted codes; from January 1, 2027 only the 2024 codes.
  • Glendale24,25

    • Allowed where zoning allows a single-family home and the lot has a main dwelling, not on a lot with a duplex or other multifamily. You need a Zoning Clearance Letter before you submit construction documents.
    • The city’s handout words the size cap and the number of ADUs on a large lot in ways that may not match state law, and the city is working on an amendment. Ask Glendale for the current numbers.
    • Setbacks: 5 ft at the side and rear. Separate utility meters are required, including a separate city water meter on a new tap. No separate address; the ADU uses a Unit suffix.
    • No extra parking, and the ADU cannot be sold apart from the main home. Owner-residency rules for renting are in flux, so ask the city before you plan rent.
    • Building code: 2024 IRC with city amendments, effective January 9, 2026.

COSTS TO EXPECT

Our fee, and building costs where a public source gives one.

  • Our drawing package for a detached ADU up to 600 sq ft, with the energy sheets and a site and zoning check

    Our fee, from the price list

    $9,400

  • Glendale’s own rough estimate of city fees for a 1,000 sq ft ADU. Water and sewer impact fees depend on meter size24

    Building cost, not our fee

    about $4,179

FAQ

Frequently asked questions

  • Does state law mean I can build an ADU?

    It means a covered city has to treat an ADU as a permitted use on a lot where a single-family home is allowed, with no public hearing. It does not remove your HOA rules, a utility easement, septic limits or your city’s size, setback and utility rules. Run the checks above.

  • How big can an ADU be?

    The state cap is the lesser of 75% of the main home’s gross floor area or 1,000 sq ft. Some cities allow more on a large lot: Phoenix on lots over 10,000 sq ft, Tempe on lots of 1 acre or more. Lot coverage limits still count the ADU.

  • Does my HOA matter?

    Yes. State law and city codes do not override private HOA rules or deed covenants. A city just cannot make your permit depend on a covenant. If your HOA bans ADUs, get that settled in writing before you pay for plans.

  • Can the city make me add parking?

    State law says a city cannot require extra parking for the ADU, or a fee in place of it. Chandler’s code text has carried an extra-space rule, so confirm with Chandler. The main home still keeps its own required parking, so converting a garage or carport can mean replacement parking elsewhere on the lot.

  • Can I rent the ADU?

    A city cannot ban long-term rental of the main home or the ADU. Short-term rental rules are set by each city, and several require the owner to live on site. Mesa requires a license for short stays. Check your city’s row above.

  • Can I sell the ADU separately?

    Not in Mesa, Scottsdale or Glendale. Chandler lets a lot with an ADU be split only if each new lot meets minimum lot size, has its own utilities, legal access and meets all codes. For Phoenix, Gilbert and Tempe the city pages do not say, so ask.

  • Does an ADU need fire sprinklers?

    State law says a city may not require a fire sprinkler system or the commercial building code for an ADU. Ordinary building, fire and health codes still apply. For an attached ADU, ask your city’s fire department.

  • Can I turn my garage into an ADU?

    Often, but it has to meet every ADU rule and the work needs a permit. Phoenix wants replacement parking outside the front setback. Glendale applies all ADU rules to a converted building, and Scottsdale does not grandfather old ADUs or guest houses.

  • Which building code will my ADU follow?

    It depends on your city: 2024 IRC in Phoenix, Mesa, Chandler and Glendale; 2021 in Scottsdale; 2018 in Gilbert; Tempe takes 2018 or 2024 through 2026 and 2024 only from 2027. Your city’s page for building codes has the current list.

  • What does Archipartners Design do on an ADU?

    We draw the permit plans and check your lot against these rules. We are not an architect. Any engineering that needs a seal is done and sealed by an engineer. Send us the address and what you want built. We reply within one business day.

SOURCES

Where each fact comes from.

Every number in a superscript links to the official page below. Opens in a new tab.

  1. A.R.S. 9-461.18 — Accessory dwelling units

    Arizona Legislature · checked November 2026

  2. Laws 2024, ch. 196 (HB 2720) — ADU law as passed

    Arizona Legislature · checked November 2026

  3. Accessory dwelling units

    City of Phoenix · checked November 2026

  4. Beginner’s guide to ADUs (PDF)

    City of Phoenix · checked November 2026

  5. Short-term rental registry

    City of Phoenix · checked November 2026

  6. Residential process sheet (PDF)

    City of Phoenix · checked November 2026

  7. Water Services quick reference guide 2026 (PDF)

    City of Phoenix · checked November 2026

  8. 2024 IRC amendments (PDF)

    City of Phoenix · checked November 2026

  9. Accessory dwelling units

    City of Mesa · checked November 2026

  10. Mesa building code

    City of Mesa · checked November 2026

  11. Accessory dwelling units

    City of Scottsdale · checked November 2026

  12. ADU FAQs, October 2025 (PDF)

    City of Scottsdale · checked November 2026

  13. Building codes

    City of Scottsdale · checked November 2026

  14. Ordinance 5113 — state housing mandates (PDF)

    City of Chandler · checked November 2026

  15. Detached buildings and structures chart, January 2025 (PDF)

    City of Chandler · checked November 2026

  16. Homeowner building permit manual (PDF)

    City of Chandler · checked November 2026

  17. Amendments to the 2024 International Codes (PDF)

    City of Chandler · checked November 2026

  18. ADU guide (PDF)

    Town of Gilbert · checked November 2026

  19. Land Development Code, 5.2.3 Accessory dwelling unit (PDF)

    Town of Gilbert · checked November 2026

  20. Permits, applications and checklists

    Town of Gilbert · checked November 2026

  21. Accessory dwelling units (ADUs)

    City of Tempe · checked November 2026

  22. ADU development guide (PDF)

    City of Tempe · checked November 2026

  23. Building codes and amendments

    City of Tempe · checked November 2026

  24. ADU requirements and fee estimates, revised 2026-06-25 (PDF)

    City of Glendale · checked November 2026

  25. Building codes

    City of Glendale · checked November 2026

  26. Onsite wastewater treatment facilities, Chapter 2 Section 8 (PDF)

    Maricopa County Environmental Services · checked November 2026

WHEN YOU’RE READY

Want us to draw it?

Send us the address and what you want built. We reply within one business day.

ADU / Casita Field Guide: can my lot take one? · Archipartners Design