Fire or Damage Rebuild Field Guide: what you can put back as it was, and when today’s code applies

Ten checks, the stop signs, and what seven Phoenix-area cities say about rebuilding after damage, before you pay for plans.

After a fire or other damage, most people want the house back the way it was. Sometimes the city lets you do that. Sometimes it asks you to meet today’s code, and for a house that no longer fits its zoning, a damage threshold can decide the whole job. Your insurer’s adjuster scope and the city’s permit are separate. The plans must meet the city’s code. Run these checks first. Every fact links to an official page, and where a city page does not say, we tell you to ask.

Updated November 23, 2026 · Free · one email with the link

Built from the city pages of Phoenix, Mesa, Scottsdale, Chandler, Gilbert, Tempe, Glendale. Anywhere else, check your own city’s page.

One email with the link. We don’t sell your address; you can unsubscribe with one click.

5-MINUTE GO / NO-GO

Answer these before you spend money.

Each check is a yes or no. A “no” or a “don’t know” is something to settle first.

  1. Is the building secured, and has anyone checked that it is safe to go in?

    Glendale says to keep the property secure at all times and to remove or take down badly damaged parts that could collapse or blow away. Chandler’s property maintenance ordinance requires a vacant building to be secured to its board-up specifications, and it counts a building with fire, water or other substantial damage that nobody can live in as vacant. If the city judges it unsafe, it can post it as condemned.24,16

  2. Have you told the city and asked which permit it wants before any repair starts?

    Mesa lists fire damage repairs and demolition of a structure among the work that needs a construction permit. Glendale says not to start construction or repairs until a permit has been issued, and its abatement specialist wants the owner’s name, the address, a short description and the date of the damage. Phoenix’s damage guideline has you call the inspector to meet at the site before any work.7,24,2

  3. Has an Arizona-registered engineer looked at the structure?

    Scottsdale’s building code amendments say that when a building’s structural parts have been exposed to fire, the city requires a structural damage assessment from an Arizona-registered engineer, and structural calculations for replacements. Ask your city whether your house follows that rule. Where an engineer is needed, the engineer seals; we draw the permit plans.12

  4. Is the job a put-back to the original condition, or does it change anything?

    Phoenix’s damage guideline says a damage repair permit is meant to rebuild the damaged area to its original condition, and that work beyond that needs complete plans. Severe damage, such as losing the whole roof and walls, goes through the same path as new construction or a major remodel. Making it bigger, moving walls or adding rooms turns a repair into a new design.2,3

  5. Was the house already legal but non-conforming (setbacks, height or use that no longer match zoning)?

    Phoenix, Mesa, Scottsdale, Tempe and Glendale each have a damage test for such structures, and the tests are not the same. Phoenix and Mesa compare the cost to restore with the cost to rebuild, Scottsdale and Tempe use the value, and Glendale’s text speaks of floor area. Chandler’s article says reconstruction must meet the district rules. Gilbert’s code was not readable for this guide, so ask the town.1,6,9,20,23,15,18

  6. Were the house and every earlier addition permitted and on record?

    The zoning rules protect only what was legal when it was built. Chandler says nothing in its article approves continuing a building that did not comply when it was built, and Scottsdale says the same about uses and structures that broke earlier zoning rules. A burned, unpermitted addition cannot simply be put back. Deal with its drawings first; we cover as-built drawings in a separate guide.15,11

  7. Is the house on a historic register or in a historic overlay?

    Phoenix adds Historic Preservation review to demolition of properties on its Historic Property Register, and a separate demolition plan review for National Register or HP-Eligible buildings. Scottsdale has four historic-overlay subdivisions that need Historic Preservation approval. Glendale’s code allows restoring a building on the National, state or city register, and Tempe lets its Director allow a deviation for historic reasons.4,13,23,20

  8. If the roof is trusses, do you know who will check and replace them?

    Scottsdale’s amendments ask for engineered truss design by an approved manufacturer for structural replacements, keyed to the roof framing plan, and say the city may want calculations showing charred framing is still adequate, or tests of damaged parts. Smoke and heat damage to a truss roof is the kind of thing an engineer must judge, not a drawing.12

  9. Does the plan include taking part of the house down, and is that permitted first?

    Phoenix says demolition of an existing residential or commercial structure needs a permit before any work, inside or outside, and its over-the-counter guideline lists total demolitions and interior non-structural demolitions that need a demolition plan. Mesa lists demolition of a structure as needing a permit. Chandler can require a damaged building to be demolished after written notice. Ask Maricopa County whether your demolition needs an asbestos notice.4,3,7,16,27

  10. Is the lot in a flood hazard area?

    Phoenix’s amended IRC says the repair of substantial damage to a building in a flood hazard area must follow its flood section and Chapter 32B of the Phoenix City Code. Phoenix also says a project that needs floodplain review cannot be permitted over the counter until that approval is obtained. For other cities, ask your planner.5,3

STOP SIGNALS

If you see any of these, pause.

  • The house was non-conforming and was badly damaged

    Stop before you draw. In Phoenix, restoring above half the cost of rebuilding needs a use permit before reconstruction. In Mesa, above that line the rebuild must meet the whole zoning ordinance unless an Administrative Use Permit allows less, and above 75% it may not be rebuilt at all. In Scottsdale, a structure destroyed to 50% or more of its value is then subject to all district regulations. Tempe and Glendale have their own 50% tests. Get the city’s numbers in writing first.1,6,9,20,23

  • The damage reaches the foundation or the framing

    Fire in the walls, floor or roof framing is a structural question. Scottsdale asks for an assessment by a registered engineer and calculations for charred framing, and testing may be required for damaged parts. Phoenix treats the loss of all the roof and walls like new construction. No city page we read says an old foundation can be reused as is, so an engineer must decide that.12,2

  • It is in a historic district or on a historic register

    Historic review can come before demolition, and it can change what you may rebuild. Phoenix and Scottsdale name the properties that need it, Glendale and Tempe write historic exceptions into their rules. Ask the historic preservation office before any tear-down, not after.4,13,23,20

  • An earlier addition with no permit burned

    The zoning rules protect only legal structures. Chandler says nothing in its article approves continuing a building that did not comply when built, and Scottsdale says the same for earlier zoning violations. We cannot draw a put-back of something the city never permitted. This becomes an as-built and permit-history job first.15,11

  • A smoke- or heat-damaged truss roof

    Do not assume trusses that still stand are fine. Scottsdale asks for engineered truss design for replacements and may want proof that charred members are adequate. Have a registered engineer look at the roof before anyone sells you a repair, and before you order new trusses.12

  • The city has posted the building or sent a demolition notice

    Chandler can post an unsafe building as condemned, no one may occupy it, and it can require a damaged building to be demolished after written notice, with the deadline in the notice. If the owner does not act, the city may demolish at the owner’s cost. Glendale’s abatement process starts with an investigation report. Answer the city first; plans come after.16,24

  • Flood hazard area and substantial damage

    In Phoenix, repair of substantial damage in a flood hazard area follows its flood rules and Chapter 32B of the City Code, and floodplain review is a step the over-the-counter route cannot skip. Ask the city for your lot’s flood status before you design.5,3

WHAT THE CITY WILL ASK FOR

Expect to be asked for these.

  • A description of the damage, the date, and a site meeting

    Glendale wants the legal owner’s name, the address, a short description of the damage and the date, then visits and writes an investigation report. Phoenix’s damage guideline has the inspector meet you at the site first and compare the damage to the permit quantities. Have photos and a written list of what was lost.24,2

  • A structural assessment and calculations

    Scottsdale asks for an assessment by an Arizona-registered engineer when structure has been exposed to fire, structural calculations for replacements, engineered truss design keyed to the roof framing plan, and possibly calculations or tests for charred members. Other cities did not publish a rule we could read, so ask whether they want an engineer’s letter. The engineer seals; we draw.12

  • A plan of what is repaired and replaced

    Scottsdale’s amendments call for plans and building permits when building components, including electrical, plumbing and mechanical systems, are repaired or replaced. Phoenix wants complete plans for anything beyond the original condition, and a demolition plan for interior or partial demolitions. Show what stays, what goes and what is new.12,2,3

  • Proof of what was legal before the damage, and the cost figures

    For a non-conforming house the city will compare costs or value against its threshold. Phoenix and Scottsdale use three competent appraisers where the city is unsure, Tempe uses a qualified appraiser approved by the Director, and Mesa excludes the foundation from its cost. Bring your permit history, your survey and a rebuild cost estimate, and ask which measure the city uses.1,9,20,6

  • A demolition permit, and the county’s asbestos question

    Demolition needs its own permit in Phoenix and Mesa before work starts. Phoenix asks for a plot plan when more than one building is on the lot, and a demolition plan for interior or partial demolition. Ask Maricopa County Air Quality whether your demolition needs an asbestos notice, and who files it.4,3,7,27

  • Utility release after the inspection

    APS’s service manual says that when a fire or the fire department disconnected an installation, APS will not energize or restore service until the wiring has been approved and the inspection authority has told APS, where inspection is required. Ask your electric and gas utility what they need. We found no official page for SRP or Southwest Gas on reconnecting after a fire.26

  • Zoning check for the rebuild

    Ask the zoning staff in writing how your city measures the damage, whether your house is legal non-conforming, and what the rebuild may look like. Glendale’s code speaks of floor area and a permit deadline of 12 months, Phoenix of starting within one year. Bring a site plan with setbacks, existing and proposed.23,1,6

  • Historic preservation review

    If the house is on a register or in an overlay, expect a separate review. Phoenix names which demolitions go to its Historic Preservation Office. Scottsdale requires a pre-application in its four historic-overlay subdivisions. Ask before demolition.4,13

YOUR CITY’S RULES

Your city’s rules.

Short notes from each city’s own pages. Rules change, so open the linked page for the current text.

  • Phoenix1,2,3,4,5

    • Zoning Ordinance Section 905: a legal non-conforming structure damaged by fire, flood, windstorm or a similar event may be restored to its original non-conforming condition if the cost of restoring it does not exceed 50% of the cost of reconstructing the entire structure, a building permit is secured, and reconstruction starts within one year. Above 50%, a use permit is required before reconstruction. Where the cost is unclear, three competent appraisers decide.
    • The city’s damage repair guideline (dated 2010, an internal process) says the permit is for rebuilding the damaged area to its original condition, anything beyond needs complete plans, and severe damage follows the new-construction path. The over-the-counter guideline lists minor fire, water, storm or vehicle damage repairs to legally existing structures. Ask which path your job is on.
    • Demolition needs a permit before any work. Historic Property Register properties get an added historic review, and a separate demolition plan review applies to National Register or HP-Eligible buildings, with a $390 review fee on the city’s page.
    • Code: 2024 IRC with Phoenix amendments (the amendments keep IRC section R102.6.1, Additions, alterations or repairs). In a flood hazard area, repair of substantial damage follows the amended flood section and Chapter 32B of the City Code.
  • Mesa6,7,8

    • Zoning Ordinance 11-36-4: a damaged legal non-conforming structure may be rebuilt to its previous condition only if it does not exceed its prior size, extent or configuration, the cost does not exceed 50% of the cost to rebuild the whole structure (not counting the foundation), and the prior use returns.
    • Above 50%, the rebuild must meet the whole zoning ordinance, unless the Zoning Administrator approves an Administrative Use Permit for a smaller version that keeps the prior use. Above 75% of that cost, the structure may not be rebuilt.
    • The Residential Construction page lists fire damage repairs and demolition of a structure as work that needs a construction permit. Code: 2024 I-Codes, in effect since 2026-01-08. Permit Services: 480-644-4273.
  • Scottsdale9,10,12,13,14

    • Zoning Sec. 1.1305: a non-conforming structure destroyed by fire, explosion or act of God to 50% or more of its value, as decided by three competent appraisers, is then subject to all regulations of its district.
    • Sec. 1.1304 allows reasonable repairs, and lets a main single-family dwelling in the listed residential districts be reconstructed on the ground story, without more height, if the cumulative total stays under 50% of its square footage at the time it became non-conforming and the work meets district rules. Ask staff how this fits a damaged house.
    • Building code amendments (Sec. 31-14) require a structural damage assessment by an Arizona-registered engineer when structure has been exposed to fire, structural calculations and engineered trusses for replacements, and plans and permits for repaired or replaced components. They are written as amendments to the building code; ask whether your house follows them.
    • Four historic-overlay subdivisions need a pre-application and Historic Preservation approval. Code: 2021 IRC with Scottsdale amendments, effective 2023-01-07.
  • Chandler15,16,17

    • City Code 35-2002: a non-conforming building may not be enlarged, extended or reconstructed unless the work meets every rule of its district. The article has no fire-damage percent test that we could find. Ask a planner before you plan a put-back (Planner of the Day, 480-782-3050).
    • Property maintenance ordinance (Chapter 30): an unsecured vacant building must be secured to the city’s board-up specifications, and that includes a building with fire, water or other substantial damage that is unoccupied. An unsafe building can be posted as condemned. The city can require a dilapidated building to be demolished after written notice, or do it at the owner’s cost.
    • Code: 2024 IRC with Chandler amendments (Ordinance 5108). Chandler also adopts the 2024 International Existing Building Code. We found no Chandler page that states a fire-damage permit rule, so ask Development Services what it wants.
  • Gilbert18,19

    • Non-conforming rules: the Land Development Code is published as a PDF we could not open for this guide. Ask Gilbert Planning (Development Services, 480-503-6700) whether a damaged non-conforming house can be restored, and under what test.
    • Code: the town’s page shows the 2018 amendments in force today, with the 2024 amendments expected January 2027. Ask before you start which permit a fire repair uses, because we found no town page on it.
  • Tempe20,21,22

    • Zoning and Development Code 3-506: if a non-conforming development is damaged by more than 50% of its most recent pre-damage valuation, as decided by a qualified appraiser and approved by the Community Development Director, any repair or rebuild must meet the district, unless the Director allows a deviation for historic preservation reasons. The section we read does not say what applies at or under 50%, so ask.
    • Section 3-503: legal non-conforming developments may be maintained but not re-erected or replaced unless brought into compliance.
    • Code: applications may use the 2018 or 2024 adopted codes through 2026-12-31, and only the 2024 codes from 2027-01-01. Plans are approved before permits, through the Citizen Access Portal; questions to permitcenter@tempe.gov. We found no Tempe page on fire-damage permits or demolition.
  • Glendale23,24,25

    • Unified Development Code 35.7.103: a damaged or partly destroyed legal non-conforming building may be reconstructed to its original condition provided that up to 50% of the original gross floor area may be restored, and building permits are obtained within 12 months of the damage. Ask Planning how that wording applies to your house. Restoring a building on the National, state or Glendale historic register is not prevented.
    • The abatement page for fire damage: contact the city’s abatement building specialist first, keep the property secure, do not start construction or repairs until a permit has been issued, and remove or take down badly damaged parts that could collapse. The page does not mention an engineer, so ask.
    • Code: 2024 IRC adopted, with the city’s amendments effective 2026-01-09.

COSTS TO EXPECT

Our fee, and building costs where a public source gives one.

  • Our drawing package for a house repair or rebuild, a full drawing set for up to 2,000 sq ft. Engineering, the structural evaluation and seals are separate lines on the quote, and the engineer seals

    Our fee, from the price list

    $7,950

  • Phoenix’s demolition application plan review fee, for the buildings that review applies to, as printed on the city’s page. The demolition permit and other fees are separate4

    Building cost, not our fee

    $390

FAQ

Frequently asked questions

  • Do I need a permit to repair fire damage?

    Yes. Mesa lists fire damage repairs among the work that needs a construction permit, Phoenix has a damage repair permit and an over-the-counter route for minor repairs, Scottsdale’s amendments require plans and permits for repaired or replaced components, and Glendale says not to start repairs until a permit is issued. Ask your city before you start.

  • Can I rebuild exactly as it was?

    It depends on two things. First, whether you are putting back the original condition or changing the house: Phoenix says anything beyond the original needs complete plans. Second, whether the house was legal but non-conforming: then each city’s damage test decides, and the tests differ. Mesa, Phoenix, Scottsdale, Tempe and Glendale have rules we could read. Chandler says reconstruction must meet the district. For Gilbert, ask.

  • What is the “50% rule”?

    There is no single rule. Phoenix compares the cost to restore with the cost to rebuild the whole structure. Mesa does the same but leaves out the foundation, and adds a 75% line above which it may not be rebuilt. Scottsdale looks at destruction of 50% or more of the value, set by three appraisers. Tempe looks at damage above 50% of the pre-damage valuation. Glendale’s text speaks of restoring up to 50% of the gross floor area. Ask your city which measure it uses.

  • Does my insurance decide what I can build?

    No. Your insurer’s adjuster scope and the city’s permit are separate. The plans must meet the city’s code. Talk to your insurer about the claim and to the city about the permit, and do not assume one answers the other. We do not give insurance advice.

  • Do I need an engineer after a fire?

    If fire reached the structure, almost always yes in practice. Scottsdale’s amendments require an assessment from an Arizona-registered engineer, with calculations for charred framing and engineered trusses. The other city pages we read do not state a rule, so ask. The engineer evaluates and seals; we draw the permit plans.

  • Can the city make me tear the building down?

    In Chandler, yes, in some cases. The property maintenance ordinance lets the city condemn an unsafe building, and require a dilapidated building to be demolished after written notice, with the deadline in the notice. If the owner does not act, the city may do it and assess the cost to the property. Glendale’s abatement process begins with a site investigation. Other cities: ask. Keep the building secured in the meantime.

  • Will APS turn my power back on?

    APS’s service manual says that where a fire or the fire department disconnected the installation, APS will not energize or restore service until the wiring has been approved and the inspection authority has notified APS, where inspection is required. So the city’s electrical permit and inspection come first. For SRP or Southwest Gas, we found no official page on fire reconnection, so ask them.

  • Which building code applies to the repair?

    It depends on the city. Phoenix, Chandler, Mesa and Glendale use the 2024 IRC with local amendments. Scottsdale uses the 2021 IRC. Gilbert uses the 2018 IRC today. Tempe accepts the 2018 or 2024 codes through 2026-12-31, then only 2024. Phoenix keeps IRC section R102.6.1, Additions, alterations or repairs, and Chandler also adopts the 2024 Existing Building Code. Ask the plan reviewer how your city applies its rules to a repair.

  • What if the home is in a historic district?

    Expect a separate review, possibly before any demolition. Phoenix adds Historic Preservation review for properties on its register and a demolition plan review for National Register or HP-Eligible buildings. Scottsdale has four historic-overlay subdivisions that need approval. Glendale’s code does not prevent restoring a building on its registers, and Tempe lets its Director allow a deviation for historic reasons. Ask the historic office first.

  • How do I start with you?

    Send us the address, photos of the damage, and anything the city or an engineer has already written. We reply within one business day and tell you what the city will likely need first. If the house is non-conforming and badly damaged, or an unpermitted addition burned, we will say so before you pay for plans.

SOURCES

Where each fact comes from.

Every number in a superscript links to the official page below. Opens in a new tab.

  1. Residential over the counter permits guideline (PDF)

    City of Phoenix · checked November 2026

  2. Demolition requests

    City of Phoenix · checked November 2026

  3. 2024 IRC amendments (PDF)

    City of Phoenix · checked November 2026

  4. Residential construction

    City of Mesa · checked November 2026

  5. Mesa building code

    City of Mesa · checked November 2026

  6. 2021 IBC amendments, Sec. 31-14 fire damaged property (PDF)

    City of Scottsdale · checked November 2026

  7. Single-family residential construction process

    City of Scottsdale · checked November 2026

  8. Building codes

    City of Scottsdale · checked November 2026

  9. City Code Chapter 35, Article XX: nonconforming uses

    City of Chandler · checked November 2026

  10. Property maintenance ordinance 4951, Chapter 30 (PDF)

    City of Chandler · checked November 2026

  11. Amendments to the 2024 International Codes (PDF)

    City of Chandler · checked November 2026

  12. Land Development Code (page that links the PDF)

    Town of Gilbert · checked November 2026

  13. Permits, applications and checklists

    Town of Gilbert · checked November 2026

  14. Residential plan review

    City of Tempe · checked November 2026

  15. Building codes and amendments

    City of Tempe · checked November 2026

  16. Unified Development Code 35.7.103: path to conformity

    City of Glendale · checked November 2026

  17. Abatement (fire damage)

    City of Glendale · checked November 2026

  18. Building codes

    City of Glendale · checked November 2026

  19. Electric Service Requirements Manual, paragraph 100.9 (PDF)

    Arizona Public Service (APS) · checked November 2026

  20. Asbestos demolition and renovation

    Maricopa County Air Quality Department · checked November 2026

WHEN YOU’RE READY

Want us to draw it?

Send us the address and what you want built. We reply within one business day.

Fire or Damage Rebuild Field Guide: what you can put back as it was, and when today’s code applies · Archipartners Design