FIELD GUIDE
Residential Care Home Field Guide: turning a house into an assisted living home
What Arizona and the Phoenix-area cities check before a single-family house can become a licensed assisted living home for up to 10 residents.
This guide is for one job: a single-family house in the Phoenix area that becomes an assisted living home. Under Arizona law (A.R.S. 36-401) an assisted living home gives resident rooms to ten or fewer residents; eleven or more is an assisted living center, which follows different rules. Daycares and larger care facilities are out of scope here. Larger care facilities need a registered architect, and we refer those. Three things decide a house conversion: the state license from the Arizona Department of Health Services (ADHS), the city's zoning rules for care homes, and the building and fire rules that apply once six or more people live in the house. Cities treat each differently, so the notes below are city by city. We draw the permit plans. Your city and ADHS decide what is allowed. This is a checklist to run before you buy, rent or design, not legal advice.
Updated November 23, 2026 · Free · one email with the link
Built from the city pages of Phoenix, Mesa, Scottsdale, Chandler, Gilbert, Tempe, Glendale. Anywhere else, check your own city’s page.
One email with the link. We don’t sell your address; you can unsubscribe with one click.
5-MINUTE GO / NO-GO
Answer these before you spend money.
Each check is a yes or no. A “no” or a “don’t know” is something to settle first.
Is it a house, and will 10 or fewer residents live there?
Arizona calls a facility with rooms for ten or fewer residents an assisted living home. Eleven or more is an assisted living center, with its own physical plant rules and plan approval by ADHS. Check the count your city allows too: Chandler and Gilbert state a limit of five residents in their zoning pages, and Tempe's starts at five.1,6,7,17,19,20
Do you know the care level: supervisory, personal or directed care?
ADHS licenses by care level. Directed care is for people who cannot recognize danger, call for help or make basic care choices. A higher level means more safety features in the plans, such as a way for a resident to call staff and plans for residents who may wander.1,4
Can every resident leave the house without help in an emergency?
Phoenix splits Group R-4 into two conditions: all residents can leave without help, or some need limited spoken or physical help. The condition sets the minimum sprinkler type. Say it plainly to the city; a house that must handle residents who need help has a harder plan than one that does not.8,9
Do the resident bedrooms work on the ground floor?
ADHS wants resident sleeping areas on the ground floor of an assisted living home. The exception is a resident who directs their own care, walks without help and has two usable exits to the outside. A two-story house with upstairs bedrooms for frail residents usually will not work.4
Does each bedroom meet the size, door and window rules?
ADHS sets at least 80 sq ft for a private bedroom and 60 sq ft per person in a shared one, not counting closet or bathroom. No more than two people share a room. The room needs its own door to a hallway, common area or outdoors, daylight from a window, and a window or door that can be used to get outside. It cannot be a passage to a common area.4
Can the bathrooms be counted: one toilet and sink per 8 residents, one tub or shower per 8?
That is the ADHS ratio. Resident bathrooms also need grab bars at the toilet and shower, slip-resistant tub and shower floors, a window that opens or other ventilation, and privacy. At least one bathroom must be reachable from a common area and usable by visitors. Phoenix's code guide also lists a toilet and sink per 10 occupants and one kitchen sink.4,8
Can the entry, ramps and a bathroom work for wheelchairs and walkers?
ADHS requires exterior doors to have ramps or other devices for wheelchair and walker users, and an outdoor activity space with a hard surface for wheelchairs and some shade. Phoenix's guide also asks for an accessible route from the site arrival point to an accessible entrance and at least one accessible toilet and bathing room, with a cost cap on some of that work.4,8
Can the house take fire sprinklers, with enough water supply?
Phoenix requires sprinklers when a house changes to Group R-4, and Tempe says a 6 to 10 resident home needs fire sprinklers. ADHS lets a home use smoke detectors and extinguishers instead of a sprinkler system, but the city rule still applies. Ask the fire department and your water provider early what flow and meter the system needs. We have not found an official size rule, so we do not state one.8,9,20,4
Do the kitchen, dining area and laundry fit the home?
ADHS asks for a dining area with enough tables and chairs, a common area for socializing, a washer and dryer (or a laundry service) residents can use, hot water kept between 95 and 120 degrees F where residents use it, and soiled linen kept away from the kitchen and food storage. Cooking appliances are not allowed in resident sleeping rooms, per Phoenix's guide.4,8
Have you read the HOA rules (CC&Rs) for the lot?
Tempe says the city has no authority over CC&Rs, so that is settled between the owner and the HOA. Gilbert says an HOA may not prohibit a group home but may still require it to follow the CC&Rs. Cities differ, so get the CC&Rs and ask a lawyer before you commit.20,19
STOP SIGNALS
If you see any of these, pause.
The city's spacing rule between group homes
Another registered home within the distance blocks you unless the city grants an exception or accommodation. Phoenix: 1,320 feet. Mesa, Scottsdale, Chandler, Gilbert, Tempe and Glendale: 1,200 feet. Mesa counts other community residences and assisted living homes and centers. Chandler gives a map tool to check. Check first, before drawings.10,12,15,17,19,20,22
More residents than a home license or your city allows
Eleven or more residents is an assisted living center under state law, a different license and plan approval, and in Mesa a Council Use Permit in specific zones. Chandler and Gilbert state a five-resident limit in their zoning pages, with waiver or accommodation routes. Tempe approves 6 to 10 only with a Reasonable Accommodation Waiver. A larger care facility needs a registered architect, and we refer it.1,6,12,17,19,20
A house that cannot meet the bedroom or exit rules
Not enough ground-floor bedrooms, rooms under 80 sq ft private or 60 sq ft each shared, a bedroom that is a passage to another room, or no window or door out of a bedroom are each a stop. Phoenix's guide also asks for an escape opening in every sleeping room below the fourth story. Count rooms with a tape before you offer on the house.4,8
Sprinkler water supply or meter size
A change to Group R-4 brings fire sprinklers in Phoenix, and Tempe says the same for 6 to 10 residents. If the lot's water service or meter cannot carry the system, the cost can change the whole deal. Ask your water provider and the fire department before you buy. We could not find an official size rule, so we do not state one.8,9,20
An HOA or CC&Rs that fight the use
City approval does not settle a private HOA dispute. Tempe says CC&Rs are outside the city's authority. Gilbert says HOAs may require a group home to follow the CC&Rs. Read them first and speak with a lawyer.20,19
Residents who need help leaving, in an upstairs or one-exit layout
Both ADHS and Phoenix treat residents who need help to get out differently. If some residents need help, the sprinkler minimum goes up and ADHS wants those residents on the ground floor. If the plan only works with upstairs rooms, or if the exits cannot be reached by someone in a wheelchair, stop and rethink the house.4,8
Open code or zoning violations on the property
Phoenix's registration form has the applicant certify that the lot has no outstanding zoning or building violations, unless the violation is part of setting up the use. Unpermitted additions or garage rooms you plan to use as bedrooms need to be fixed first.10
WHAT THE CITY WILL ASK FOR
Expect to be asked for these.
Zoning registration or clearance for a care home
Each city has its own door: Phoenix zoning registration for homes with more than 5 residents, Mesa annual community residence registration, Scottsdale care home review, Chandler zoning clearance, Gilbert registration, Tempe group home application and Glendale group home reservation. Expect a site plan and a floor plan with room sizes, a description of the residents and staff, and often a copy of the state license.10,12,15,17,19,20,22
A change of occupancy to Group R-4
Phoenix and Scottsdale classify 6 to 10 residents as Group R-4; up to 5 stays Group R-3. Phoenix's Care Facility Occupancy Certification asks how many residents, caregivers and what care, then tells you whether an occupancy change and sprinklers are required. Scottsdale asks for a Certificate of Occupancy for an existing building. Tempe says 6 to 10 residents needs an occupancy change.8,9,15,20
Building plans: floor plan, egress and a stated occupant load
Phoenix's checklist asks for an occupancy change narrative, a construction type and height and area review, unit separation plans, an egress plan and a notarized letter from the owner stating the maximum occupant load, with residents per sleeping room and staff on site. Expect corridor, door and ventilation checks too.8
Fire sprinkler, alarm and extinguisher plans
Phoenix lists the sprinkler design basis, a listed fire alarm that watches the sprinkler valves, smoke alarm layout, carbon monoxide alarms where there are fuel-burning appliances, and portable extinguishers. Sprinkler design is its own set of plans from a sprinkler contractor; we coordinate it with the building plans.8
A fire department inspection
Chandler has you schedule a Fire Prevention inspection after planning approval and get the department's signature on a registration form. Glendale has you contact the Fire Department for a required inspection after planning approval. Tempe says its Fire Medical Rescue inspectors inspect registered group homes each year. Mesa resumed annual inspections of assisted living homes covered by its city code.17,22,20,13
Accessibility on the plans
Phoenix expects an accessible route to the main activity areas, accessible sleeping unit counts (at least one if all residents can leave on their own, at least two if some need help), an accessible toilet and bathing room, a 36 inch exterior route from the arrival point and parking calculations. ADHS separately requires ramps at exterior doors.8,4
State license and city business license, in the city's order
The order differs. Scottsdale gives conditional approval first and then wants the ADHS license and city business registration. Chandler wants a copy of the state license after a tentative clearance. Glendale will not grant the business license until the state license and Certificate of Occupancy are issued. ADHS takes applications through its online licensing system. Ask each city which comes first.15,17,22,5
YOUR CITY’S RULES
Your city’s rules.
Short notes from each city’s own pages. Rules change, so open the linked page for the current text.
Phoenix8,9,10,11
- Phoenix's code guide treats up to 5 residents as Group R-3 and 6 to 16 as Group R-4, with a change of occupancy for a house that becomes R-4.
- Sprinklers are required for the change of occupancy: NFPA 13D at minimum when all residents can leave on their own, NFPA 13R at minimum when some need limited help.
- Zoning registration is for group homes with more than 5 residents, with a 1,320 foot separation. The city lists a $250 zoning verification fee on the form. Ask which registration your ADHS license goes under.
- Parking: two stalls for up to 10 residents. More than 10 residents is 1 stall per 2 beds and a traffic review.
Mesa12,13,14
- A Community Residence houses 5 to 10 people with disabilities and registers with Planning every year; 4 or fewer unrelated people is not a Community Residence.
- The home must be at least 1,200 feet from other Community Residences, Assisted Living Homes and Assisted Living Centers. A significant physical feature between homes can remove the rule.
- ADHS licensing is required. Mesa's building code page says the 2024 I-codes apply to permit applications from 2026-01-08. Ask Mesa how it classifies your occupancy and sprinklers.
Scottsdale15,16
- A care home serves more than 6 and up to 10 residents with disabilities plus 2 full-time caregivers, in single-family districts. 6 to 10 residents is Group R-4; 5 or fewer is R-3 and skips the spacing review.
- Care homes must be 1,200 feet apart, measured lot line to lot line, with limited exceptions. Total home area can be no more than 35 percent of the lot's net area.
- Steps: pre-application, zoning review, a Certificate of Occupancy permit through the One Stop Shop with building and fire inspections, then the ADHS license and city business registration. The page gives a 180-day period after conditional approval.
Chandler17,18
- Residential care homes and group homes register for a zoning clearance. The standard is a maximum of 5 residents, excluding staff, and 1,200 feet from other registered homes.
- Homes for people with a disability may ask for a reasonable accommodation waiver from those standards. Ask Chandler how a 6 to 10 resident home is handled. Fee on the city's sheet: $120 zoning clearance application.
- The city's zoning process includes a Fire Prevention inspection and business registration with Tax and Licensing. Chandler applies amendments to the 2024 International Codes.
Gilbert19
- Gilbert's page says homes may serve a maximum of five residents, excluding staff, with exceptions case by case by the state, and says group homes must register with the Town.
- The page states a 1,200 foot separation between group homes. The Land Development Code sections are 5.1.5 (group homes) and 5.1.6 (recovery residences). Ask Gilbert how a 6 to 10 resident home is handled.
Tempe20,21
- Tempe's ordinance allows up to 5 residents in a group home, at least 1,200 feet from the lot line of another registered group home. Approval is handled administratively.
- A 6 to 10 resident home needs an occupancy change, extra life safety measures such as fire sprinklers, and a Reasonable Accommodation Waiver from a city staff committee.
- Tempe's Fire Medical Rescue inspects registered group homes each year. Tempe's code page allows the 2018 or 2024 building codes through 2026 and only the 2024 codes from 2027.
Glendale22,23
- Glendale's FAQ lists a Residential Care Home for 6 to 10 unrelated adults with disabilities or minors, allowed in SR, R-1, R-2 and R-O zones, with a state license and a city business license.
- Group homes must be 1,200 feet apart. A Group Home Reservation holds the address for 60 days and can be extended twice with proof of progress. The business license waits for the state license and Certificate of Occupancy.
- Glendale's building code page says the 2024 codes were adopted, with its building amendments effective 2026-01-09. A building change such as new sprinklers may need Design Review.
FAQ
Frequently asked questions
What is the difference between an assisted living home and a center?
By Arizona definition, a home gives resident rooms to ten or fewer residents and a center to eleven or more. A house conversion in this guide is a home. A center has its own ADHS physical plant rules and plan approval.
Does a 6 to 10 resident home count as R-4?
Phoenix and Scottsdale say yes: up to 5 residents stays R-3 and 6 or more is R-4 under their pages. Tempe says 6 to 10 residents needs an occupancy change. For Mesa, Chandler, Gilbert and Glendale we did not find a statement, so ask the building department how it classifies your use.
Do I need fire sprinklers in the house?
In Phoenix, yes for a change to R-4. Tempe says a 6 to 10 resident home needs fire sprinklers. ADHS's home rules allow smoke detectors and extinguishers instead of a sprinkler system, but the city rule still applies. For the other cities, ask the fire department before you design.
Do you draw plans for a bigger care facility?
No. We draw the permit plans for a house that becomes a home for ten or fewer residents. Larger care facilities need a registered architect, and we refer them.
What does ADHS look at in the building?
ADHS holds an on-site initial inspection as part of its review and says to be compliant before you schedule it. The home checklist covers the bedrooms, bathrooms, common and dining areas, exterior ramps, outdoor activity space, smoke detectors, an extinguisher rated at least 2A-10-BC, hot water, laundry access, and pool fencing if there is a pool. ADHS also posts a plan approval form that names assisted living centers; we did not confirm whether a home must submit plans, so ask ADHS.
Does state law stop a city from blocking a group home?
Not for us to say. A.R.S. 36-582 treats small residential facilities as a residential use, but A.R.S. 36-581 ties that article to people with a developmental disability, and it is not clear it covers an ADHS assisted living home. Tempe cites it. Ask your city and, if the answer matters to your deal, a lawyer.
Does the state license or the city approval come first?
It depends on the city. Scottsdale gives conditional approval before the ADHS license. Chandler wants the state license copy after a tentative zoning clearance. Glendale will not issue a business license before the state license and Certificate of Occupancy. Ask the city for its order before you sign a lease or buy.
What if the house has a pool?
ADHS requires a wall or fence at least 5 feet high around a pool, not chain-link, with a self-closing, self-latching gate. It also asks for a life preserver or shepherd's crook and posted pool rules. An uncovered spa must be covered and locked when not in use. Plan for this in the site plan.
SOURCES
Where each fact comes from.
Every number in a superscript links to the official page below. Opens in a new tab.
- A.R.S. 36-401 — Definitions (assisted living home, center, care levels)
Arizona Legislature · checked November 2026
- A.R.S. 36-581 — Definitions (residential facility, developmental disability)
Arizona Legislature · checked November 2026
- A.R.S. 36-582 — Residential facilities; zoning
Arizona Legislature · checked November 2026
- Assisted Living Home Initial Checklist (PDF), version 25-4, June 2025
Arizona Department of Health Services · checked November 2026
- Assisted Living Facilities licensing
Arizona Department of Health Services · checked November 2026
- Physical plant codes and standards crosswalk for assisted living centers (PDF)
Arizona Department of Health Services · checked November 2026
- Approval of architectural plans and specifications of a health care institution (PDF)
Arizona Department of Health Services · checked November 2026
- Residential Group Homes: R-3 to R-4 conversion code guide, February 2026 (PDF)
City of Phoenix · checked November 2026
- Care Facility Occupancy Certification (PDF)
City of Phoenix · checked November 2026
- Zoning registration for community residence centers and group homes (PDF), revised 11/20/24
City of Phoenix · checked November 2026
- 2024 IRC amendments (PDF)
City of Phoenix · checked November 2026
- Community Residences
City of Mesa · checked November 2026
- Fire code and supporting information
City of Mesa · checked November 2026
- Mesa building code
City of Mesa · checked November 2026
- Care homes and group homes
City of Scottsdale · checked November 2026
- Building codes
City of Scottsdale · checked November 2026
- Residential care home / group home zoning clearance process, 2026 (PDF)
City of Chandler · checked November 2026
- Amendments to the 2024 International Codes (PDF)
City of Chandler · checked November 2026
- Group homes and recovery residences
Town of Gilbert · checked November 2026
- Group homes
City of Tempe · checked November 2026
- Building codes and amendments
City of Tempe · checked November 2026
- Planning and zoning FAQ
City of Glendale · checked November 2026
- Building codes
City of Glendale · checked November 2026
WHEN YOU’RE READY
Want us to draw it?
Send us the address and what you want built. We reply within one business day.