Skip to main content

FIELD GUIDE

Room Addition and Second Story Field Guide: will your lot and your house carry it?

Twelve checks, the stop signs, and what seven Phoenix-area cities ask for, before you pay for plans.

Adding space looks simple on paper. Your lot has to have room for it, your house has to carry it, and your power, air conditioning and sewer have to keep up. An HOA, an easement or a septic tank can stop the job before the first drawing. Run these checks first. Every fact links to an official page, and where a city page does not say, we tell you to ask.

Updated November 23, 2026 · Free · one email with the link

Built from the city pages of Phoenix, Mesa, Scottsdale, Chandler, Gilbert, Tempe, Glendale. Anywhere else, check your own city’s page.

One email with the link. We don’t sell your address; you can unsubscribe with one click.

5-MINUTE GO / NO-GO

Answer these before you spend money.

Each check is a yes or no. A “no” or a “don’t know” is something to settle first.

  1. Does the addition fit inside your setbacks?

    Setbacks come from your zoning district and, in Scottsdale, sometimes from your subdivision’s own amended standards. In Phoenix R1-6 the standard front setback is 20 ft and the rear 25 ft; in R1-10 both are 25 ft. Interior sides are 10 ft and 3 ft in both. Ask your city for your lot’s numbers.7,6,12,15

  2. Is there room left under your lot-coverage limit?

    Roofs count: the house, garage, patio covers and other buildings. In Phoenix R1-6 and R1-10 the standard limit is 50%, with 10% more allowed for an ADU or attached shade structures. Mesa and Glendale ask for the roof area of every structure on the site plan. Chandler says closing in a patio cover may mean adding another patio cover to stay within zoning.7,6,9,22,15

  3. Does the height you want match your district, and is it one story or two?

    Phoenix R1-6 and R1-10 allow 2 stories and 30 ft. For the other cities we found no official height number for houses, so ask. Phoenix’s fast inspector-permit route is for single-story additions only, so a second story takes the regular plan-review path.7,6,4

  4. Have you marked every easement on your plat, and is the addition clear of them?

    Phoenix, Mesa, Glendale and Scottsdale all want easements on the site plan or in the setback check. Chandler tells you to ask the utility companies where theirs are before you build. Building over one can mean taking the addition back out.5,9,22,12,15

  5. Is the HOA’s written yes in hand?

    Chandler says to get the association’s approval before you apply, and that the city does not enforce HOA rules. Scottsdale says the same about your covenants. Glendale says to check your HOA before you submit.15,12,21,22

  6. Are the existing house and every earlier addition permitted and on record?

    Chandler lets you look up your home’s permit history online and says unpermitted work can lead to an order to comply, and even to removal of a non-compliant room addition. Scottsdale limits nonconforming homes under its zoning rules. Find out before you design on top of something that is not legal.15,12

  7. Can the addition be framed in a standard way, or does it need an engineer’s design?

    Phoenix’s fast inspector route covers plain wood or masonry work with beams not over 20 ft span; an addition that needs a lateral analysis does not qualify. Mesa lets you use code bracing or provide engineering for the bracing. State law lets a non-registrant design an addition to a single-family home, but cities set their own sheet rules: Glendale wants plans sealed by a licensed professional. Where an engineer is needed, the engineer seals; we draw.4,10,1,21

  8. Do you know what the ground and the existing foundation can take?

    Mesa asks for a soils report or the soil bearing value from the code table. Scottsdale asks for a soils report or a soils waiver, and structural calculations. Phoenix says to follow your subdivision’s soil report on the foundation plan. A second story on a foundation built for one is a question for an engineer. We found no city page that answers it for you.10,13,5

  9. Can the new roof tie into the old one, and will the new part look like it belongs?

    Phoenix needs a roof framing plan when you alter roof framing, and wants connections detailed from the foundation to the roof. Mesa wants truss plans to match the roof framing plan. Chandler wants the addition to match the house in materials, color, roofing and design, with drawings of both the existing and the new elevations.4,5,10,15

  10. Can your electrical panel, air conditioning and water line carry the new space?

    Phoenix wants Manual J, S and D sizing for a new HVAC system on a project over 500 sq ft, and sends electrical service over 200 amps to electrical review. Mesa requires engineering for a 400-amp service. Chandler asks for a panel schedule if you add a sub-panel and a water meter worksheet if you add fixtures. Scottsdale asks for Manual S and J and water meter calculations.4,10,15,13

  11. Do you have an energy-code plan for the new space?

    Mesa and Scottsdale ask for a REScheck. Chandler says any added conditioned space meets the minimums in IRC Chapter 11, and accepts IECC Chapter 4 as well. The code edition differs by city, so the same rule can carry a different section number.10,13,15

  12. If you are not on city sewer, has the county said your septic system can take the change?

    Maricopa County’s rules say no one may install, materially alter or add to a septic system without the county’s written approval. The pages we read do not say how bedrooms are counted, so ask Maricopa County Environmental Services before you design a new bedroom. Mesa’s site plan asks you to show the septic system if you have one.2,9

STOP SIGNALS

If you see any of these, pause.

  • An easement under the footprint

    If a utility or access easement runs where the addition would go, stop and ask the utility and your city before you pay for plans. Your plat and title papers show them.5,9,22,12,15

  • Lot coverage already near the limit

    Add up every roof on the lot first. If the house, garage and patio covers already sit near your district’s limit, the addition may not fit, or something else has to come down.7,6,9,22,15

  • A historic district

    Scottsdale sends projects in four historic-overlay subdivisions to Historic Preservation staff for a Certificate of No Effect or Certificate of Appropriateness. Phoenix lists Historic Preservation review among the reviews that take a project out of its fast inspector route. Ask your city if your street is in one.12,4

  • Septic that was not sized for more

    Septic work needs Maricopa County’s written approval, and the county prohibits septic where a sewer connection can reasonably be made. If you are on septic, get the county’s answer before you design a new bedroom or bathroom.2

  • An earlier addition with no permit

    Chandler says work done without a permit can bring an order to comply and removal of the work, and that lenders and insurers can balk at it. If your house has an old addition with no permit, fixing that comes first. We will cover the as-built drawing steps in a separate guide.15

  • The HOA says no, or has not answered

    City permits do not override your covenants. Chandler and Scottsdale both say the city does not enforce them and that knowing them is your job. Wait for the written answer.15,12

  • Hillside, environmentally sensitive land or floodplain

    Phoenix takes Hillside, Grading and Drainage and Floodplain reviews out of its fast inspector route. Scottsdale adds revegetation and roof-plan sheets in Environmentally Sensitive Lands areas. Mesa points to Maricopa County Flood Control District floodplain guidelines. Ask your city which apply to your lot.4,13,10

  • Scottsdale: the cost can trigger sprinklers for the whole house

    Scottsdale says an improvement worth 25% or more of the existing structure’s valuation needs fire sprinklers throughout the home. Use the city’s valuation worksheet before you decide on the size.12

WHAT THE CITY WILL ASK FOR

Expect to be asked for these.

  • A site plan or plot plan

    Property lines with their dimensions, the house and the addition, distances to every property line, easements, the zoning setback lines, and lot coverage. Mesa also wants the roof areas and the air conditioner location, and the septic system if you have one. Glendale wants the roof coverage of every structure and a development data table.5,9,22,15

  • Existing and new floor plans

    Chandler asks for dimensioned plans showing windows and sizes, plumbing fixtures, outlets, heating, lighting and smoke alarms. It also wants the room next to the addition, with its doors and windows, and notes that a room with a closet usually counts as a bedroom.15,10

  • Foundation, framing and roof plans

    A foundation plan that follows the soil report, floor and roof framing plans with sizes and spans, connection details from foundation to roof, and a braced-wall plan. Phoenix’s fast route asks for a cross section as well. Scottsdale lists a foundation plan and building elevations.5,4,13

  • Elevations of the house and the addition

    Chandler wants elevations showing both the existing house and the addition, with wall and roof coverings and colors. Chandler, Mesa and Scottsdale all expect the new part to look like part of the house.15,13

  • Structural design, trusses and seals

    Phoenix wants any engineer who designs part of the work to seal those sheets, and truss calculations from an Arizona-registered engineer. Chandler wants sealed truss calculations or a roof truss design review waiver sealed by an Arizona-registered engineer. Scottsdale lists structural calculations. Mesa asks that seals show the license number and signature date. Glendale asks for plans sealed by a licensed professional.5,15,13,10,21

  • Energy and comfort calculations

    Mesa and Scottsdale ask for a REScheck. Chandler asks for IRC Chapter 11 or IECC Chapter 4 compliance. Phoenix and Scottsdale ask for Manual J, S and D or Manual S and J sizing when there is new HVAC.10,13,15,4

  • Power and plumbing information

    A panel schedule if you add a sub-panel, load calculations where asked, the service location and clearances, and a water meter worksheet when you add fixtures.15,10,13

  • A zoning check before the building permit

    Glendale needs a Zoning Clearance Letter from Planning before you apply for the building permit. Scottsdale offers an optional pre-application meeting and a setback request. Chandler tells you to talk to a planner first. In Tempe, plan approval comes before the permit.21,12,15,19

YOUR CITY’S RULES

Your city’s rules.

Short notes from each city’s own pages. Rules change, so open the linked page for the current text.

  • Phoenix7,6,4,8,3

    • Code: 2024 IRC with Phoenix amendments (Ordinance G-7397, effective 2025-08-01).
    • R1-6 and R1-10 standard option: 2 stories and 30 ft; lot coverage 50%, plus 10% for an ADU or attached shade structures; interior sides 10 ft and 3 ft. Front and rear: R1-6 is 20 and 25 ft, R1-10 is 25 and 25 ft. Other districts: ask.
    • Fast route (Residential Permit by Inspector): single-story additions of 1,000 sq ft or less, with conventional framing. It excludes work that needs Hillside, Grading and Drainage, Floodplain or Historic Preservation review, or an engineered design such as a lateral analysis.
    • Over 500 sq ft with new HVAC: Manual J, S and D calculations. Electrical service over 200 amps goes to electrical review.
  • Mesa9,10,11

    • Code: 2024 I-Codes in effect for applications from 2026-01-08.
    • Site plan shows setbacks, fences, easements, utilities, the septic system if any, the A/C unit, and roof, livable and non-livable square footage. Each single residence keeps 2 covered parking spaces, so an addition over the garage or carport needs a plan for them.
    • Foundation: a soils report or the code table value. Design values in the city’s table: 105 mph wind, seismic design category B. Wall bracing per the code or engineered. Engineering for a 400-amp service. REScheck for energy.
    • A new bedroom needs an emergency escape and rescue opening (2024 IRC section R319.1).
  • Scottsdale12,13,14

    • Code: 2021 IRC with Scottsdale amendments, effective 2023-01-07.
    • Some subdivisions have their own amended development standards. Use the city’s setback request to see your building envelope, with easements. An optional pre-application meeting is offered.
    • Major additions: a sealed plan set, soils report or waiver, structural and truss calculations, REScheck, Manual S and J, and water meter calculations. The city has separate minor and major addition packets.
    • Additions come with a fire sprinkler worksheet, so ask whether sprinklers or a sewer connection apply to yours. Four historic-overlay subdivisions need Historic Preservation approval.
  • Chandler15,16

    • Code: 2024 IRC with Chandler amendments (Ordinance 5108).
    • Talk to a planner before you apply about setbacks, lot coverage and design rules for your subdivision (Planner of the Day, 480-782-3050).
    • Submit an application, two plot plans, foundation plans, wall details, elevations and existing and new floor plans. Footings are at least 12 in. wide and 12 in. below grade. Sealed truss calculations or a sealed waiver.
    • A smoke alarm and CO alarm requirement applies when a sleeping room is added. Plans must show a switched exterior light at each exterior door and a landing at each main exterior door.
  • Gilbert17,18

    • Code: the town’s adoption list shows the 2018 IRC today. The town’s page says the 2024 amendments are not adopted yet and are expected January 2027.
    • The town publishes a Residential Addition, Alteration and Accessory Checklist, Residential Project Plan Requirements, and pages on soil investigation reports and a soils testing waiver. Read the checklist for your project before drawing. We could not open the checklist itself for this guide.
    • Lot coverage, height and setbacks for your district: ask the town (Development Services, 480-503-6700).
  • Tempe19,20

    • Additions and renovations must meet the adopted codes, and plans are approved before permits are issued. Submittals go through the Citizen Access Portal in the city’s electronic plan format.
    • Code: applications may use the 2018 or 2024 adopted codes through 2026-12-31. From 2027-01-01 only the 2024 codes.
    • Lot coverage, height and setbacks for houses: not stated on the pages we read. Email permitcenter@tempe.gov or ask a planner.
  • Glendale21,22,23,24

    • Code: 2024 IRC, with the city’s amendments effective 2026-01-09.
    • A Zoning Clearance Letter from Planning comes first. The city’s residential application lists a fee of $144.00 and asks for a project narrative, a site plan and elevations. A structure attached to the house and reachable from inside counts as an addition; one you cannot walk into from the house is treated as an ADU.
    • Plans must be sealed by a licensed professional and submitted as one PDF set with a sheet index. Structural changes to wall openings need structural review.

COSTS TO EXPECT

Our fee, and building costs where a public source gives one.

  • Our drawing package for a one-story addition up to 400 sq ft, with the energy sheets. Engineering and seals are separate lines on the quote

    Our fee, from the price list

    $5,500

  • Added when your home is in an HOA, for the drawings and forms the association asks for

    Our fee, from the price list

    $300

  • Glendale’s zoning clearance fee for a residential modification, as printed on the city’s application. Building permit and plan-check fees are separate22

    Building cost, not our fee

    $144.00

FAQ

Frequently asked questions

  • Do I need a permit to add a room?

    Yes. Phoenix lists room additions among the work that needs a permit and inspections, and Chandler, Mesa, Scottsdale, Tempe and Glendale all describe a permit process for additions. Building without one can bring an order to comply and removal of the work at your cost.

  • Does a second story need an engineer?

    Almost always an engineer should look at it, because the old walls and foundation must carry new weight. No city page we read gives a simple rule. Phoenix’s fast route is for single-story additions only, and an addition that needs a lateral analysis is outside it. An engineer seals the design; we draw the permit plans.

  • Do I need a soils report?

    It depends on the city. Mesa accepts a soils report or the soil value from the code table. Scottsdale asks for a soils report or a waiver. Phoenix tells you to follow your subdivision’s soil report on the foundation plan. Gilbert publishes a soils investigation page and a waiver page. Ask your city which it wants for your lot.

  • Can I add a bedroom if my home is on septic?

    Maybe, but not without the county. Maricopa County requires its written approval to alter or add to a septic system. The pages we read do not say how bedrooms are counted, so ask Maricopa County Environmental Services before you design.

  • Does the HOA have a say even if the city allows it?

    Yes. Chandler says to get the association’s approval before you apply and that the city does not enforce HOA rules. Scottsdale says the same about covenants. Get the HOA’s answer in writing first.

  • Which building code applies to my addition?

    It depends on the city. Phoenix, Chandler, Mesa and Glendale use the 2024 IRC with local amendments. Scottsdale uses the 2021 IRC. Gilbert uses the 2018 IRC today. Tempe accepts the 2018 or 2024 codes through 2026-12-31, then only 2024. Because the 2024 edition renumbered some sections, the same rule can have a different number in each city.

  • Does a new bedroom need a window I can get out of?

    Yes. Mesa’s checklist requires an emergency escape and rescue opening in every sleeping room (2024 IRC section R319.1), and Phoenix amends the same section for additions with new sleeping rooms. Chandler adds that a room with a closet usually counts as a bedroom.

  • Will my addition trigger fire sprinklers?

    In Scottsdale, an improvement worth 25% or more of the existing structure’s valuation needs sprinklers throughout the home. We found no such rule on the other cities’ pages, so ask yours.

  • What if my house already has an old addition with no permit?

    Deal with that first. Chandler says unpermitted work can bring an order to comply and removal of the work, and it lets you look up your home’s permit history online. We will cover as-built drawings in a separate guide.

SOURCES

Where each fact comes from.

Every number in a superscript links to the official page below. Opens in a new tab.

  1. Onsite wastewater treatment facilities, Chapter 2 Section 8 (PDF)

    Maricopa County Environmental Services · checked November 2026

  2. Residential projects

    City of Phoenix · checked November 2026

  3. Residential Permit by Inspector guideline, Rev. 02/24 (PDF)

    City of Phoenix · checked November 2026

  4. Residential plan submittal checklist (PDF)

    City of Phoenix · checked November 2026

  5. 2024 IRC amendments (PDF)

    City of Phoenix · checked November 2026

  6. Residential construction plan submittal checklist (PDF)

    City of Mesa · checked November 2026

  7. Mesa building code

    City of Mesa · checked November 2026

  8. Single-family residential construction process

    City of Scottsdale · checked November 2026

  9. Building codes

    City of Scottsdale · checked November 2026

  10. Homeowner building permit manual (PDF)

    City of Chandler · checked November 2026

  11. Amendments to the 2024 International Codes (PDF)

    City of Chandler · checked November 2026

  12. Permits, applications and checklists

    Town of Gilbert · checked November 2026

  13. Building code adoption dates

    Town of Gilbert · checked November 2026

  14. Residential plan review

    City of Tempe · checked November 2026

  15. Building codes and amendments

    City of Tempe · checked November 2026

  16. Submit electronic plans

    City of Glendale · checked November 2026

  17. Building permits Q and A

    City of Glendale · checked November 2026

  18. Building codes

    City of Glendale · checked November 2026

WHEN YOU’RE READY

Want us to draw it?

Send us the address and what you want built. We reply within one business day.

Room Addition and Second Story Field Guide: will your lot and your house carry it? · Archipartners Design