Skip to main content
Back to portfolioProject · 030

HOME ADDITION — RENDERING · PHOENIX, AZ · MMXXV

Phoenix Home Addition

A new living room and bathroom wing joined to an existing single-story home. The addition sits under a low single-slope tile roof, with stucco and concrete tile matched to the original house so it reads as one building. A wide sliding door between two windows opens the long, narrow living room to the yard, and light enters from both the end and side walls.

Have a similar project?

Tell us about it.

Begin a project →
Phoenix Home Addition · Home Addition — Rendering · Phoenix, AZ · Archipartners Design