Skip to main content
Back to portfolioProject · 027

ADU — RENDERING · SACRAMENTO, CA · MMXXV

Sacramento Two-Story ADU

A two-story accessory dwelling unit rendered from the firm’s front elevation: a front-gable composition-shingle roof, vertical wood and light fiber-cement siding, black-framed windows, and a covered entry reached by an exterior stair. Developed straight from the permit-set elevation to preview materials and massing.

Have a similar project?

Tell us about it.

Begin a project →
Sacramento Two-Story ADU · ADU — Rendering · Sacramento, CA · Archipartners Design