菜系专属现场指南
泰国 / 越南 / 东南亚菜 转换检查手册
该菜系特有的雷区
Pho stock pots run 18+ hours — gas load and exhaust capacity get under-spec’d.
英文 + 西班牙文 · PDF + DOCX · 邮件发送
一封包含下载链接的邮件。我们不出售您的地址,您可一键取消订阅。
该菜系常见的烧钱点
泰国 / 越南 / 东南亚菜 特有的转换难点
01 · Stock-pot range BTU + hood capture
A pho or tom yum stock-pot range runs two 80K–120K BTU burners under 60-quart pots for 18+ hours a day. That's a sustained 200K BTU heat load directly under the hood — different from a sauté line's peaks. Hood capture velocity, MUA, and even the gas-meter sizing belong in the design conversation early.
02 · Wok station alongside stock pots
Thai stir-fry needs a 100K+ BTU wok burner. Co-locating wok + stock pots under one hood is fine IF the hood is sized for both worst cases combined. Many inherited hoods were sized for the previous tenant's sandwich grill — the gap can be 1,500–3,000 CFM. Plan for a full hood replacement budget if you're re-tenanting.
03 · Fresh-herb + produce cold prep
Cilantro, Thai basil, bean sprouts, mint, lime — heavy daily produce volume that lives 3–5 days max. A single small reach-in won't hold the par. Plan a 6×8 walk-in minimum with a dedicated produce shelf, and prep tables with built-in refrigerated rails for the make-line.
04 · Fish sauce + neighbor odor
Bulk fish sauce, fermented shrimp paste, and aged tamarind have aggressive odor signatures. A shared HVAC return between kitchen and dining room (or worse, a shared exhaust with a neighboring tenant) creates lease-violation complaints. Specify negative-pressure kitchen and zero return-air sharing.
05 · Boba / Thai-tea sweetener handling
If the menu includes Thai tea or boba, you're also handling sticky sweetener syrups and tapioca pearls — which dump organic load into floor drains and clog them within months. Run separate floor drains in the beverage station, not shared with the main kitchen drain, and budget for jetting.
五个立即停止的信号
不论何种菜系,这些都会让交易作废。
闻到燃气、看到烧焦的电线,或排烟罩区域有焦黑。
排风扇缺失、断开,或剧烈震动。
卖家拒绝提供排烟罩 / 消防 / 油脂的服务记录。
必须在现有排烟罩之外增加大型烹饪设备。
房东不允许屋顶、燃气、电力或油脂截留装置作业。
考察
闻 · 看 · 听
验证
排风 · 燃气 · 电力 · 管道
报价
签约前要书面方案
谈判
或转身离开
其他菜系
01
中餐 / 锅炒
High-BTU wok ranges need real make-up air and a Type I hood with proven capture.
08
印度 / 南亚菜
Tandoor ovens have unique clearance + venting rules most inherited hoods don’t satisfy.
10
寿司 / 夏威夷盖饭 / 拉面
Cold-side sanitation + dedicated rice & seafood prep zones drive a different floor plan than hot lines.