跳到主内容
返回作品集项目 · 026

ADU — RENDERING · SAN BRUNO, CA · MMXXV

San Bruno Modern ADU

A two-story modern accessory dwelling unit rendered from the firm’s front elevation: a clean low-parapet roof, light stucco with warm wood accents, upper-level clerestory window bands, and large black-framed sliding-glass doors at grade. Developed straight from the permit-set elevation to preview materials and massing.

有类似项目?

告诉我们。

开始项目 →
San Bruno Modern ADU · ADU — Rendering · San Bruno, CA · Archipartners Design