Gilbert allows one attached and one detached ADU by right under Land Development Code Section 5.2.3, adopted in Ordinance 2931 and effective December 18, 2024. An ADU up to 1,000 sq ft gets a straight building permit through Development Services. Any ADU over 1,000 sq ft—up to the 75% of the primary home's gross floor area cap—must first get a $1,000 Administrative Use Permit from Planning before the building permit.
If you're planning a garage conversion or detached ADU in Gilbert, that 1,000-square-foot line changes your timeline and your budget.
The 1,000-square-foot threshold
An ADU 1,000 sq ft or smaller goes straight to building permit, according to Gilbert Land Development Code Table 3.1.2 and Section 5.2.3 (ADU Guide, aduzoning.org). Over 1,000 sq ft requires a $1,000 Administrative Use Permit first.
The maximum ADU size is 1,000 sq ft by right, or up to 75% of the primary home's gross floor area with an Administrative Use Permit (Gilbert LDC Section 5.2.3 and Table 3.1.2, Ordinance 2931, effective December 18, 2024, aduzoning.org).
Gilbert ADU permit path by size
Up to 1,000 sq ft
Building permit only, about $1,890 for a typical project
Over 1,000 sq ft
$1,000 Administrative Use Permit from Planning first, then building permit
Building permit fees
A $150,000 valuation costs $1,145 building permit plus $744.25 plan review (65% of the permit fee), about $1,890 total, according to Gilbert Development Services Fee Schedule Resolution 8-9 (aduzoning.org). That's the building permit alone, for a project up to 1,000 sq ft that skips the Administrative Use Permit.
What else Gilbert requires
A new detached ADU must be set back at least 5 feet from side and rear property lines, under the Arizona HB 2720 maximum setback (buildwithaplan.com).
You can rent out the ADU without living on the property—Gilbert has no owner-occupancy requirement under the Land Development Code per ARS 9-461.18 (aduzoning.org).
Gilbert ADU options
Permit path
Up to 1,000 sq ft: Building permit only
Over 1,000 sq ft: Admin Use Permit + building permit
Admin fee
Up to 1,000 sq ft: None
Over 1,000 sq ft: $1,000
Maximum size
Up to 1,000 sq ft: 1,000 sq ft
Over 1,000 sq ft: Up to 75% of home's floor area
5-foot setback
Up to 1,000 sq ft: Yes
Over 1,000 sq ft: Yes
| — | Up to 1,000 sq ft | Over 1,000 sq ft |
|---|---|---|
| Permit path | Building permit only | Admin Use Permit + building permit |
| Admin fee | None | $1,000 |
| Maximum size | 1,000 sq ft | Up to 75% of home's floor area |
| 5-foot setback | Yes | Yes |
Where an ADU or garage conversion needs structural engineering or a foundation plan, an independent engineer registered in Arizona prepares or directly supervises that part and seals it.
We are a Phoenix firm that does drafting and permit plans; our drafting team works remotely, and we take projects in all 50 states. Every set opens with a code-analysis sheet, and if the city flags an error in our drawings, we fix it free. For a quote on a Gilbert ADU or garage conversion, ask here.