Skip to main content
← Journal

November 3, 2026 · Archipartners Design

Bought a House with Unpermitted Work? How Your Next Permit Will Handle It

Garage conversions, enclosed patios and add-ons built without permits come up as soon as you apply for new work. Here’s how to plan for it.

It’s common in older Valley neighborhoods: a garage turned into a bedroom, a patio enclosed into a family room, a casita built years ago without a permit. It may never matter, until you apply for a permit to do something else.

Why the city asks

The plan reviewer checks the whole property against the city’s records, not only the new work. When the drawings show living space where the records show a garage or an open patio, the reviewer will usually ask that the existing work be permitted as part of the application. Building codes treat work done without a permit as a violation (IBC 114 and the local equivalent), and the city won’t sign off on the new work while the old work is unresolved.

How to find out what’s permitted

  • City permit search: most Valley cities let you look up past permits by address online.
  • County assessor: the recorded living area and garage count are a quick cross-check.
  • Seller disclosures and the inspection report from when you bought the home.

If the living area on the assessor’s record is smaller than the house you live in, something probably wasn’t permitted.

How legalizing usually works

  • The unpermitted area is drawn on the plans and labeled as existing work to be legalized.
  • It’s reviewed together with your new project, on the same application where the city allows it.
  • At inspection, the inspector may need to see framing, wiring, insulation or plumbing, which can mean removing some drywall or opening an access panel.
  • Anything that doesn’t meet current code, such as a bedroom without an egress window or missing smoke alarms, gets corrected.

Legalizing existing work with your next permit

  1. Find out what's permitted

    City permit search, the county assessor's record, your seller disclosures

  2. Draw it as existing work to be legalized

  3. Review it with the new project

    On the same application, where the city allows it

  4. Inspection

    May mean removing some drywall or opening an access panel

  5. Correct what doesn't meet current code

    Such as a bedroom without an egress window, or missing smoke alarms

Plan for it in the budget

The cost of legalizing depends on what’s hidden in the walls. Treat it as part of the project from day one, not something that shows up halfway through plan check.

We do drafting and permit plans for additions, ADUs and conversions in Arizona, including drawing existing work for legalization. Ask for a quote; we reply within one business day.

Have a project that fits this conversation? Send a sketch and a sentence.

Begin a project →

We reply within one business day.

Bought a House with Unpermitted Work? How Your Next Permit Will Handle It · Archipartners Design