Arizona · Restaurant Conversion

Convert a space into a restaurant in Arizona.

Phoenix, Mesa, Scottsdale, Tempe, and Chandler each run their own plan review under their own adopted codes — in Phoenix, the 2024 Phoenix Building Construction Code. The walk-before-you-sign moves matter because hood and make-up air sizing carry a real cost in this climate.

On the ground in Arizona

What changes when you convert here.

In the Valley’s hot-dry climate (zone 2B), kitchen make-up air has to be tempered: the mechanical code (IMC §508.1.1) keeps make-up air within 10°F of the kitchen’s design temperature unless the kitchen HVAC is sized for the load. A high-BTU wok or wood-oven hood moves a lot of air, so budget tempered make-up air early — a generic GC quote can leave it out.

Plan-check rhythm: Phoenix publishes its plan-review goals and monthly averages by project size, and every Arizona city must post its own review time frames (A.R.S. § 9-835). Phoenix’s Permit by Appointment program excludes restaurants and kitchens, so restaurant TIs there go through standard plan review. Outside the Valley, Tucson and Flagstaff run their own completeness and substantive review time frames; a missed cover-sheet item can still cost a correction cycle.

Grease-interceptor rules vary by city. Phoenix’s amended plumbing code gives interceptor approval to the Water Services Director and sets a 500-gallon minimum for gravity interceptors; other cities route interceptor review differently. Walk the existing interceptor with a tape measure before you sign the lease.

Hood + MUA rule

Type I hoods over wok, charbroiler, tandoor or wood-oven lines need code-required make-up air, tempered to the mechanical code’s 10°F limit unless an exception applies. Plan noncombustible wall protection behind solid-fuel appliances, and confirm gas-meter capacity before lease signing — a 600,000 Btu/h cook line needs roughly 600 cubic feet per hour of natural gas.

AHJ quirk

Phoenix publishes its plan-review goals and monthly averages by project size; check the current report before you plan around a date. Outside the Valley, Tucson and Flagstaff post their own completeness and review time frames.

Arizona · Major building departments

  • City of Phoenix Planning & Development
  • City of Mesa
  • City of Tempe
  • City of Scottsdale
  • City of Chandler
  • City of Glendale
  • City of Gilbert
  • City of Surprise
  • Maricopa County
  • Pima County
  • City of Tucson
  • City of Flagstaff

Looking at a Arizona space? We refer restaurant jobs to a registered architect — send us the address and we reply within one business day.

Ask for a referral →