Skip to main content
Back to portfolioProject · 022

CUSTOM HOME — RENDERING · ARLINGTON, AZ · MMXXV

Arlington New-Build Home

A single-story new-build home rendered from the firm’s front elevation: a low hipped composition-shingle roof with generous eaves, warm tan stucco with horizontal-siding and brick-veneer accents around the entry, a glass-and-aluminum sectional garage door, and Sonoran desert xeriscape. Developed straight from the permit-set elevation to preview materials and massing.

Have a similar project?

Tell us about it.

Begin a project →
Arlington New-Build Home · Custom Home — Rendering · Arlington, AZ · Archipartners Design