返回作品集项目 · 022
CUSTOM HOME — RENDERING · ARLINGTON, AZ · MMXXV
Arlington New-Build Home
A single-story new-build home rendered from the firm’s front elevation: a low hipped composition-shingle roof with generous eaves, warm tan stucco with horizontal-siding and brick-veneer accents around the entry, a glass-and-aluminum sectional garage door, and Sonoran desert xeriscape. Developed straight from the permit-set elevation to preview materials and massing.
图集
点击任意照片查看完整尺寸。



