Governor Gavin Newsom signed Assembly Bill 956 on September 29, 2026, and it takes effect January 1, 2027, according to BBK Law. AB 956 doubles the by-right allowance from one to two detached ADUs on single-family lots, BBK Law reports.
State law already required local agencies to ministerially approve one detached ADU on a lot with a single-family dwelling. AB 956 doubles that allowance to two detached ADUs, BBK Law states.
How AB 956 changes California ADU rights
Before January 1, 2027
One detached ADU by-right on single-family lots
AB 956 signed September 29, 2026
After January 1, 2027
Two detached ADUs by-right on single-family lots
What ministerial approval means
Local agencies must ministerially approve qualifying detached ADUs without applying local standards, BBK Law reports. "By-right" development means construction is permitted automatically if it meets all existing building and zoning codes, with no special review process, according to Pew Research.
That's the same approval path California homeowners use now for one detached ADU. The difference starting January 1: you can permit two units instead of one, and the city reviews both ministerially.
The statewide ADU trend
Four states passed new ADU laws in 2026, and nationwide, 22 states now have laws that specifically allow property owners to build ADUs, Pew Research reports. All ADU laws enacted in 2026 allow by-right development, Pew Research states.
AB 956 also broadens state limits on HOA rules and private covenants that restrict ADUs, according to BBK Law. The brief doesn't detail those changes, but the law makes it harder for a homeowners association to block an ADU that qualifies under state law.
Filing strategy
If you're planning an ADU in California and your lot can fit two units instead of one, file after January 1, 2027 to permit both under AB 956. The ministerial-approval rule means no discretionary hearing, and HOA restrictions are harder to enforce under the new law.
We do drafting and permit plans for ADUs and casitas in California and take projects in all 50 states. Every set opens with a code-analysis sheet, and if the city flags an error in our drawings, we fix it free. Ask for a quote and we'll reply within one business day.