跳到主内容
所有菜系15 / 20

菜系专属现场指南

自助餐 / 火锅 / 大型餐厅 转换检查手册

该菜系特有的雷区

Per-table induction or gas runs change the entire MEP and finish package.

英文 + 西班牙文 · PDF + DOCX · 邮件发送

一封包含下载链接的邮件。我们不出售您的地址,您可一键取消订阅。

该菜系常见的烧钱点

自助餐 / 火锅 / 大型餐厅 特有的转换难点

  • 01 · Per-table induction electrical load

    A hot-pot table with 2 induction zones at 1,800W each = 3,600W per table. A 40-seat dining room at 2 seats/table = 72 kW of induction-only load, separate from kitchen + HVAC + lighting. That requires service upgrade or sub-panels routed through the floor — $20K–$60K depending on existing service capacity.

  • 02 · Per-table exhaust + downdraft

    Hot-pot tables generate steam + aerosolized broth at every seat. Korean BBQ + hot-pot tables typically use down-draft ductwork through the slab to a rooftop fan. That requires structural cuts in the floor, dedicated grease ducts per table, and a centralized exhaust fan + MUA system. Slab-on-grade only; upper-floor is usually impossible.

  • 03 · Buffet line sneeze-guards + temperature

    FDA Food Code §3-301.11 requires sneeze guards at customer-facing buffet lines plus hot holding ≥135°F and cold holding ≤41°F. Inherited cafeteria tables rarely have the heating elements or wells sized for sustained temperature. Spec NSF-7 hot/cold wells with built-in thermometers, not standalone chafers + ice.

  • 04 · Dish-room scale + 3-comp sink size

    A 150-seat buffet pushes 1,500+ dishes per service. The dish room needs a flight-type or rack-conveyor dishwasher, not a single-rack undercounter. That's 220V/3-phase, a 60-gallon booster, separate 3-comp sink for pots, and 200 sq ft of dish room minimum. Inherited dishrooms are almost always undersized.

  • 05 · HVAC for large dining + per-zone control

    A 150-seat dining room with active hot-pot tables generates massive sensible + latent load. A single rooftop unit cannot zone for variable occupancy (slow lunch vs packed dinner). Plan 3–5 separate zones with VAV boxes; $25K–$50K versus the call-backs from a one-zone system that runs cold in corners and hot at the entry.

五个立即停止的信号

不论何种菜系,这些都会让交易作废。

  • 闻到燃气、看到烧焦的电线,或排烟罩区域有焦黑。

  • 排风扇缺失、断开,或剧烈震动。

  • 卖家拒绝提供排烟罩 / 消防 / 油脂的服务记录。

  • 必须在现有排烟罩之外增加大型烹饪设备。

  • 房东不允许屋顶、燃气、电力或油脂截留装置作业。

通用考察流程 — 四个阶段
  1. 考察

    闻 · 看 · 听

  2. 验证

    排风 · 燃气 · 电力 · 管道

  3. 报价

    签约前要书面方案

  4. 谈判

    或转身离开

已经在考察场地?

现场结论之后是申报图纸。APD 绘制合规、可让承包商报价、足够快的图纸,以保住交易 — 覆盖美国 50 州,三语 EN / ES / 中。

联系

开始一个项目。

工作室

Phoenix4435 E Chandler Blvd · Suite 200

提供英语 · 西班牙语 · 中文服务。 (602) 628-1231

自助餐 / 火锅 / 大型餐厅 餐厅转换检查手册 · Archipartners Design