返回作品集项目 · 019
BATHROOM RENOVATION — RENDERING · CHANDLER, AZ · MMXXV
Chandler Primary Bath Renovation
A photorealistic interior rendering for a primary-bath renovation: a sage-green vanity run with brass fixtures, an arched mirror, and wood-look flooring. Delivered as part of the design-development package so the owner could approve finishes before the permit set was drawn.
图集
点击任意照片查看完整尺寸。
