The shipping containers Arizona stacked along the Mexican border in 2022 may get a second life as homes. A Tucson nonprofit, Boxes of Hope, is working with La Frontera Arizona on a village of 350 to 450 affordable rental homes, each built from a single 40-foot shipping container, according to reporting by the Sierra Vista Herald/Review (November 21, 2026) and Realtor.com.
The project says it has support from Tucson officials, U.S. Sen. Mark Kelly's office and the Arizona Department of Housing. No funding commitments have been announced yet, the site isn't final, and rents haven't been published. But the idea is moving, and it raises a question many Arizona homeowners are already searching: can you actually live in a shipping container here, and what does the permit take?
Where the containers came from
In 2022, then-Gov. Doug Ducey's administration placed shipping containers along parts of the border near Yuma and in the San Rafael Valley in southeastern Cochise County. The federal government sued over the containers being on federal land. Arizona took the barriers down and agreed to help pay for restoration, and the lawsuits were dismissed in 2023 (Herald/Review).
Boxes of Hope founder Beau Phillips told the Herald/Review he got the idea after seeing the stacked containers from a plane leaving Tucson, then asked the state surplus office whether he could buy some. He estimates each container costs about $2,000 if the state doesn't donate it.
What each home would look like
Boxes of Hope builds on a 40-foot high-cube container, 8 feet wide (boxesofhopeaz.org). Phillips estimates about 300 square feet of living space inside each one, and puts the cost of converting one container into a home at about $59,000 (Herald/Review).
- A bedroom with room for a queen bed, closed off by a pocket door
- A kitchenette with a two-burner stove, sink and refrigerator
- A full bathroom in every home, so each unit is self-contained
- Foam insulation behind the drywall, double-pane windows and a mini-split air conditioner
- Shading on the outside to help keep the steel cool in a Tucson summer
Boxes of Hope plan at a glance
Homes
Proposed: 350 to 450 rentals
Still open: Eligibility rules
Each home
Proposed: About 300 sq ft, one 40-foot container
Still open: Rents
Conversion cost
Proposed: About $59,000 per home
Still open: Full budget and funding
Site
Proposed: 25 to 30 acres near a bus route
Still open: Final site, letter of intent in January
| — | Proposed | Still open |
|---|---|---|
| Homes | 350 to 450 rentals | Eligibility rules |
| Each home | About 300 sq ft, one 40-foot container | Rents |
| Conversion cost | About $59,000 per home | Full budget and funding |
| Site | 25 to 30 acres near a bus route | Final site, letter of intent in January |
Who it's for, and when
Phillips said he has Section 8 applicants in mind, along with seniors, veterans, single parents and workers who struggle to cover rent. La Frontera Arizona would offer behavioral health care and job training on site, and the plan mixes long-term rentals with transitional housing (Herald/Review; boxesofhopeaz.org).
The need is real. Tucson's housing department said in October that more than 40,000 people were waiting for public housing or a Housing Choice Voucher, and the city closed both waitlists to new applicants on January 1, 2026 (Herald/Review).
The team is looking at a 25- to 30-acre property near utilities, grocery stores and an existing bus route, about two miles from where the containers are stored. Each empty container weighs about 8,000 pounds, so a short haul matters. Boxes of Hope plans to unveil a finished model home and name the site in January, hopes to sign a letter of intent with the landowner then, and aims to start construction later in 2027 (Herald/Review).
Can you live in a shipping container in Arizona?
Yes, but a container home is a building like any other: it needs zoning approval and a building permit, and the city reviews it against the code it has adopted. The 2021 International Building Code added Section 3115 for intermodal shipping containers used as buildings. Under it, the construction documents have to show the dimensions and physical properties of the container's steel and wood floor, and the container's existing data plate has to be verified by an approved agency, with a report given to the owner (2021 IBC Section 3115, ICC). Check which code edition your city or county has adopted before you design.
Permitting a shipping container home or ADU in Arizona
Zoning
Confirm the lot allows a home or ADU of that size, and the setbacks
Container record
Data plate verified by an approved agency, report to the owner
Structure
Steel and floor properties shown; cut openings and foundation engineered
Living standards
Insulation, windows, cooling, plumbing and electrical drawn to code
Permit set
Plans submitted for plan review and building permit
Most of the work is in the details a city plan reviewer checks:
- Zoning first. Whether a container can be a primary home, an ADU or a casita depends on your city's zoning code, not on the box. Even Phillips said whether the units count as tiny homes "depends on the definition."
- Openings weaken the box. Every door and window cut into the steel walls changes how the container carries load, so those openings and the foundation and tie-downs need structural design.
- Heat is the Arizona problem. Steel walls heat up fast. Insulation, window choice and cooling have to meet the energy code and work in our summers, which is why Boxes of Hope plans foam insulation, double-pane windows and outside shading.
- It's still a house. Plumbing, electrical, egress and fire separation are reviewed the same way they would be for any small home.
Where a container home or ADU needs structural engineering for cut openings, the foundation or tie-downs, an independent engineer registered in Arizona prepares or directly supervises that part and seals it.
Thinking about a container home or ADU?
Whether you're planning one container as a backyard ADU or casita or a small cluster on your own land, the permit set is where the project succeeds or stalls. We are a Phoenix firm that does drafting and permit plans; our drafting team works remotely, and we take projects in all 50 states. Every set opens with a code-analysis sheet, and if the city flags an error in our drawings, we fix it free. For a quote on a container home or ADU in Tucson, Phoenix or anywhere in Arizona, ask here. We reply within one business day.
Sources: Matt Hickman, "Boxes of Hope eyes affordable homes for former Arizona-Mexico border wall containers," Sierra Vista Herald/Review, November 21, 2026; Realtor.com, "Inside a Plan To Convert Shipping Containers From the Border Wall Into Affordable Housing"; boxesofhopeaz.org; International Code Council, 2021 International Building Code, Section 3115.