返回作品集项目 · 016
MULTIFAMILY — RENDERING · ARIZONA CITY, AZ · MMXXV
Arizona City Fourplex
A new-construction fourplex — two stories, four units around shared stair cores. The exterior was rendered from the firm’s front elevation (stucco walls, a hipped tile roof, and a repeated window-and-door rhythm) over a permit set with ground- and second-floor plans coordinated with structural and plumbing.
图集
点击任意照片查看完整尺寸。

